CERC · Central Electricity Regulatory Commission
Renewable Energy Certificate Regulations, 2010
Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010
RegulationDated 14 Jan 2010No. L-1/12/2010-CERC dated 14th January, 2010
Replaced by Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Central Electricity Regulatory Commission's notification of 14 January 2010 (p1) creates the Renewable Energy Certificate mechanism — a way to sell the renewable attribute of generation as a tradable certificate, separate from the electricity itself. It is made under s.66 and s.178 of the Electricity Act, 2003, applies across India except Jammu and Kashmir, and takes effect from Gazette notification, though no Gazette date is printed (p1).
Regulations 2–4 set the vocabulary (p2–3) and the architecture. The Commission designates a Central Agency to register eligible entities, issue certificates, settle accounts and keep a repository of transactions; that agency must draft a detailed procedure for registration, verification of generation and issuance, and submit it for Commission approval within sixty days of the notification, after giving State Agencies and stakeholders three weeks to comment. The Commission can direct changes to that procedure at any time (p4–5). Certificates come in two categories, solar and non-solar, sold to obligated entities against the matching limb of their renewable purchase obligation (p5).
Regulations 5–7 govern entry and issuance. A generator qualifies only if it is accredited by the State Agency, has no power purchase agreement at a preferential tariff for that capacity, and sells its output within defined price and route limits, including against the distribution licensee's pooled cost of power purchase (p5–6). Registration follows a fixed timeline with reasons recorded for refusal and an appeal to the Commission (p6–7); registration can be revoked for default or breach after a hearing, and the Commission can itself trigger an enquiry (p7–8). Certificates are applied for against metered, grid-injected generation, each representing one megawatt hour, on a fortnightly application cycle (p8–9).
Regulations 8–10 confine dealing to power exchanges operating under Commission-approved rules and byelaws (p9), set pricing as market-discovered within floor and forbearance prices that the Commission may fix separately for solar and non-solar certificates, guided by stated principles (p10), and give certificates a limited validity from issuance that survives later revocation of accreditation, with extinction on exchange (p10–11).
Regulations 11–15 leave fees, charges, a share of sale proceeds for State Agency capacity building, and auditor remuneration to later orders; provide for compliance auditors whose qualifications sit in the Schedule (p11–12, p14); and reserve powers of direction and relaxation to the Commission (p13).
Read with this
Amendments and corrections
- Dated 29 Sep 2010REC (First Amendment) Regulations, 2010
- Dated 10 Jul 2013Renewable Energy Certificate (REC) (Second Amendment) Regulations, 2013
- Dated 30 Dec 2014Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — Third Amendment, 2014
- Dated 27 Jan 2015Corrigendum to the Notification dated 30 December 2014 on Solar RECs, January 2015
- Dated 23 Mar 2016Renewable Energy Certificate Regulations, 2010 — Fourth Amendment, 2016
- Dated 28 Mar 2016Renewable Energy Certificate Regulations, 2010 — Fourth Amendment, 2016
Commencement notices and reasons
- Dated 14 Jan 2010Renewable Energy Certificate Regulations, 2010 — Statement of Objects and Reasons
- Dated 27 Sep 2010Renewable Energy Certificate Regulations, 2010 — First Amendment — Statement of Objects and Reasons
- Dated 10 Jul 2013Renewable Energy Certificate (Second Amendment) Regulations, 2013 — Statement of Reasons
- Dated 30 Dec 2014Renewable Energy Certificate (Third Amendment) Regulations, 2014 — Statement of Reasons
- Dated 28 Mar 2016Renewable Energy Certificate Fourth Amendment Regulations, 2015 — Statement of Reasons
Procedures and orders made under it
- Dated 30 Dec 2014Determination of Forbearance and Floor Price for the Solar REC, 2014
- Date not statedDesignation of NLDC as Central Agency under the Renewable Energy Certificate Regulations
- Date not statedREC Procedures
Other copies of these documents (4)
- Dated 14 Jan 2010Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — as amended
- Dated 29 Sep 2010Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — First Amendment, 2010
- Dated 10 Jul 2013Renewable Energy Certificate Regulations, 2010 — Second Amendment, 2013
- Dated 30 Dec 2014Renewable Energy Certificate Regulations, 2010 — Third Amendment, 2014
Proposed changes (drafts with no final yet)
- Dated 26 Jun 2015Renewable Energy Certificate for Renewable Energy Generation (Fifth Amendment) Regulations, 2015 — Draft
- Dated 26 Jun 2015Public notice: Public Notice on Draft Renewable Energy Certificate (Fifth Amendment) Regulations, 2015
- Released with the notice dated 26 Jun 2015Explanatory memorandum: Renewable Energy Certificate (Fifth Amendment) Regulations, 2015 — Explanatory Memorandum — Draft
Earlier drafts
- Dated 2 Apr 2013Renewable Energy Certificate (Second Amendment) Regulations, 2013 — Draft
- Released with the notice dated 2 Apr 2013Explanatory memorandum: REC (Second Amendment) Regulations, 2012 — Explanatory Memorandum — Draft
- Dated 2 Apr 2013Public notice: REC (Second Amendment) Regulations, 2013 — Draft — Public Notice
- Dated 30 Sep 2014Renewable Energy Certificate for Renewable Energy Generation (Third Amendment) Regulations, 2014 — Draft
- Released with the notice dated 30 Sep 2014Explanatory memorandum: REC Third Amendment Regulations, 2014 — Explanatory Memorandum — Draft
- Dated 30 Sep 2014File: Solar REC Floor and Forbearance Price Order, 2014
- Dated 30 Sep 2014Public notice: Draft REC (Third Amendment) Regulations, 2014 and Solar REC Forbearance and Floor Price Order — Public Notice
- Released with the notice dated 31 Mar 2015Renewable Energy Certificate (Fourth Amendment) Regulations, 2015
- Dated 31 Mar 2015File: Proposed Framework for Forecasting, Scheduling & Imbalance Handling for Wind and Solar RE at Inter-State Level — Draft
- Dated 31 Mar 2015Public notice: Proposed Framework for Forecasting, Scheduling & Imbalance Handling for Wind and Solar RE Generating Stations at Inter-State Level — Public Notice, 2015
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.