CERC · Central Electricity Regulatory Commission

Renewable Energy Certificate Regulations, 2010

Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010

RegulationDated 14 Jan 2010No. L-1/12/2010-CERC dated 14th January, 2010

Replaced by Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission's notification of 14 January 2010 (p1) creates the Renewable Energy Certificate mechanism — a way to sell the renewable attribute of generation as a tradable certificate, separate from the electricity itself. It is made under s.66 and s.178 of the Electricity Act, 2003, applies across India except Jammu and Kashmir, and takes effect from Gazette notification, though no Gazette date is printed (p1).

Regulations 2–4 set the vocabulary (p2–3) and the architecture. The Commission designates a Central Agency to register eligible entities, issue certificates, settle accounts and keep a repository of transactions; that agency must draft a detailed procedure for registration, verification of generation and issuance, and submit it for Commission approval within sixty days of the notification, after giving State Agencies and stakeholders three weeks to comment. The Commission can direct changes to that procedure at any time (p4–5). Certificates come in two categories, solar and non-solar, sold to obligated entities against the matching limb of their renewable purchase obligation (p5).

Regulations 5–7 govern entry and issuance. A generator qualifies only if it is accredited by the State Agency, has no power purchase agreement at a preferential tariff for that capacity, and sells its output within defined price and route limits, including against the distribution licensee's pooled cost of power purchase (p5–6). Registration follows a fixed timeline with reasons recorded for refusal and an appeal to the Commission (p6–7); registration can be revoked for default or breach after a hearing, and the Commission can itself trigger an enquiry (p7–8). Certificates are applied for against metered, grid-injected generation, each representing one megawatt hour, on a fortnightly application cycle (p8–9).

Regulations 8–10 confine dealing to power exchanges operating under Commission-approved rules and byelaws (p9), set pricing as market-discovered within floor and forbearance prices that the Commission may fix separately for solar and non-solar certificates, guided by stated principles (p10), and give certificates a limited validity from issuance that survives later revocation of accreditation, with extinction on exchange (p10–11).

Regulations 11–15 leave fees, charges, a share of sale proceeds for State Agency capacity building, and auditor remuneration to later orders; provide for compliance auditors whose qualifications sit in the Schedule (p11–12, p14); and reserve powers of direction and relaxation to the Commission (p13).

Standard name
REC Regulations
Primary topics
Renewable energy certificates (REC), Renewable purchase obligation (RPO / RCO), Power markets and exchanges

Read with this

Other copies of these documents (4)

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document