CERC · Central Electricity Regulatory Commission
Renewable Energy Certificate Regulations, 2010 — Fourth Amendment, 2016
Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) (Fourth Amendment) Regulations, 2016
AmendmentDated 23 Mar 2016F. No. L-1/12/2010-CERC dated 23rd March, 2016
Replaced by Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Renewable Energy Certificate Regulations, 2010.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's Fourth Amendment to its 2010 Renewable Energy Certificate (REC) regulations, notified in New Delhi on 23 March 2016 (p3). It takes effect from the date of publication in the Official Gazette, which is not printed in the pages available. It changes who may participate in the REC scheme in three ways.
Regulation 2 rewrites Regulation 5(1)(c) of the Principal Regulations (p3–4). It deletes the second to sixth provisos and the explanation, and inserts a fresh set: a renewable generator selling its electricity component to a third party through open access may claim RECs on its entire generation only if it does not avail, or propose to avail, concessional or promotional transmission/wheeling charges or banking facility benefit; a generator that forgoes those benefits on its own becomes eligible only from the date of forgoing; the condition falls away if the State Commission or State Government withdraws the benefits; and disputes about whether benefits were availed go to the Appropriate Commission. A new Clause (1B) makes renewable captive plants — including plants that do not meet the Electricity Rules, 2005 CGP tests but have self-consumption — ineligible for RECs on self-consumed energy if commissioned outside the 29 September 2010 – 31 March 2016 window or not registered with the Central Agency by 30 June 2016; those inside the window and registered in time may claim full generation, but face a three-year wait after forgoing benefits voluntarily.
Regulation 3 substitutes Regulation 8(3), allowing an eligible renewable generator or captive plant to retain certificates to offset its own renewable purchase obligation as a consumer, subject to State Agency certification and verification (p4). A closing Note lists the Principal Regulations and their earlier amendments and corrigendum (p4).
Read with this
The regulation
- Dated 14 Jan 2010Renewable Energy Certificate Regulations, 2010
Amendments and corrections
- Dated 29 Sep 2010REC (First Amendment) Regulations, 2010
- Dated 10 Jul 2013Renewable Energy Certificate (REC) (Second Amendment) Regulations, 2013
- Dated 30 Dec 2014Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — Third Amendment, 2014
- Dated 27 Jan 2015Corrigendum to the Notification dated 30 December 2014 on Solar RECs, January 2015
- Dated 28 Mar 2016Renewable Energy Certificate Regulations, 2010 — Fourth Amendment, 2016
Commencement notices and reasons
- Dated 14 Jan 2010Renewable Energy Certificate Regulations, 2010 — Statement of Objects and Reasons
- Dated 27 Sep 2010Renewable Energy Certificate Regulations, 2010 — First Amendment — Statement of Objects and Reasons
- Dated 10 Jul 2013Renewable Energy Certificate (Second Amendment) Regulations, 2013 — Statement of Reasons
- Dated 30 Dec 2014Renewable Energy Certificate (Third Amendment) Regulations, 2014 — Statement of Reasons
- Dated 28 Mar 2016Renewable Energy Certificate Fourth Amendment Regulations, 2015 — Statement of Reasons
Procedures and orders made under it
- Dated 30 Dec 2014Determination of Forbearance and Floor Price for the Solar REC, 2014
- Date not statedDesignation of NLDC as Central Agency under the Renewable Energy Certificate Regulations
- Date not statedREC Procedures
Other copies of these documents (4)
- Dated 14 Jan 2010Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — as amended
- Dated 29 Sep 2010Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — First Amendment, 2010
- Dated 10 Jul 2013Renewable Energy Certificate Regulations, 2010 — Second Amendment, 2013
- Dated 30 Dec 2014Renewable Energy Certificate Regulations, 2010 — Third Amendment, 2014
Proposed changes (drafts with no final yet)
- Dated 26 Jun 2015Renewable Energy Certificate for Renewable Energy Generation (Fifth Amendment) Regulations, 2015 — Draft
- Dated 26 Jun 2015Public notice: Public Notice on Draft Renewable Energy Certificate (Fifth Amendment) Regulations, 2015
- Released with the notice dated 26 Jun 2015Explanatory memorandum: Renewable Energy Certificate (Fifth Amendment) Regulations, 2015 — Explanatory Memorandum — Draft
Earlier drafts
- Dated 2 Apr 2013Renewable Energy Certificate (Second Amendment) Regulations, 2013 — Draft
- Released with the notice dated 2 Apr 2013Explanatory memorandum: REC (Second Amendment) Regulations, 2012 — Explanatory Memorandum — Draft
- Dated 2 Apr 2013Public notice: REC (Second Amendment) Regulations, 2013 — Draft — Public Notice
- Dated 30 Sep 2014Renewable Energy Certificate for Renewable Energy Generation (Third Amendment) Regulations, 2014 — Draft
- Released with the notice dated 30 Sep 2014Explanatory memorandum: REC Third Amendment Regulations, 2014 — Explanatory Memorandum — Draft
- Dated 30 Sep 2014File: Solar REC Floor and Forbearance Price Order, 2014
- Dated 30 Sep 2014Public notice: Draft REC (Third Amendment) Regulations, 2014 and Solar REC Forbearance and Floor Price Order — Public Notice
- Released with the notice dated 31 Mar 2015Renewable Energy Certificate (Fourth Amendment) Regulations, 2015
- Dated 31 Mar 2015File: Proposed Framework for Forecasting, Scheduling & Imbalance Handling for Wind and Solar RE at Inter-State Level — Draft
- Dated 31 Mar 2015Public notice: Proposed Framework for Forecasting, Scheduling & Imbalance Handling for Wind and Solar RE Generating Stations at Inter-State Level — Public Notice, 2015
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.