Skip to content

CERC · Central Electricity Regulatory Commission

Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — as amended

Central Electricity Regulatory Commission (Terms and Conditions for Recognition and Issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010

Regulation · Gazette copyDated 14 Jan 2010Published in the Gazette 18 Jan 2010L-1/12/2010-CERC dated 14th January, 2010

Replaced by Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Renewable Energy Certificate Regulations, 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission (Terms and Conditions for Recognition and Issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010 create India's REC framework. Notified on 14 January 2010 and published in the Gazette on 18 January 2010, they apply throughout India except Jammu and Kashmir and come into force on Gazette notification (p1). The text is a consolidated version carrying footnote markers for amendments made in 2010, 2013, 2014 and 2016 and a corrigendum of 27 January 2015 (p2–11, Note p11).

Regulations 1–2 fix title, commencement, extent and definitions — eligible entity, obligated entity, floor and forbearance price, Central and State Agencies, and the sources treated as renewable (p1–2). Regulation 3 lets the Commission designate a Central Agency to register eligible entities, issue and account for certificates and maintain a transaction repository, and requires it to publish a detailed procedure within sixty days after a three-week comment window for State Agencies (p3). Regulation 4 creates the two certificate categories, solar and non-solar, each linked to the matching renewable purchase obligation (p3).

Regulation 5 is the eligibility core: generating companies need State Agency accreditation, must not have an RPO-serving power purchase agreement at a s.62 or s.63 tariff, and must sell at pooled cost of power purchase or at mutually agreed or market-determined prices; later sub-regulations admit distribution licensees that over-procure renewables and bar captive self-consumption plants outside specified commissioning and registration windows (p3–6). Registration is decided by the Central Agency within fifteen days with appeal to the Commission; Regulation 6 sets out revocation of registration (p6–7).

Regulations 7–10 govern issuance and trading: one certificate per MWh injected or deemed injected, the vintage-multiplier formula and sunset for pre-2015 solar projects, dealing only through power exchanges, floor and forbearance price principles, and a 1095-day validity with revocation consequences for false information (p7–9). Regulations 11–15 cover fees and charges, funding for State Agency capacity building, compliance auditors, directions and the power to relax; the Schedule prescribes auditor qualifications (p9–11).

Standard name
REC Regulations
Primary topics
Renewable energy certificates (REC), Renewable purchase obligation (RPO / RCO), Power markets and exchanges

Read with this

The regulation

Other copies of these documents (3)

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document