Skip to content

CERC · Central Electricity Regulatory Commission

Corrigendum to the Notification dated 30 December 2014 on Solar RECs, January 2015

Corrigendum

CorrigendumDated 27 Jan 2015Published in the Gazette 31 Dec 2014L-1/12/2010-CERC dated 27th January, 2015

Replaced by Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Corrects the Renewable Energy Certificate Regulations, 2010 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page CERC corrigendum, dated 27 January 2015, that corrects a single line of an earlier Commission notification (p1). The notification being corrected is No. L-1/12/2010-CERC dated 30 December 2014, published in the Gazette of India, Extraordinary, Part-III, Section 4, S. No. 380 dated 31 December 2014 (p1).

The sole correction is a textual insertion: at page 4, line 30 of that notification, after the word "applicable", the words "for the existing and future solar RECs" are to be inserted (p1). The insertion therefore narrows or clarifies the scope of a provision in the parent notification so that it covers both existing and future solar renewable energy certificates.

The document does not restate the parent notification's substance, its enabling provisions, or any date of effect; it operates purely as a drafting correction to the 30 December 2014 text. Signed by the Secretary, CERC (p1).

Standard name
REC Regulations
Primary topics
Renewable energy certificates (REC)

Read with this

The regulation

Other copies of these documents (4)

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document