Skip to content

CERC · Central Electricity Regulatory Commission

REC Third Amendment Regulations, 2014 — Explanatory Memorandum — Draft

Explanatory Memorandum for the "Draft Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) (Third Amendment) Regulations, 2014"

Explanatory memorandum to a draftReleased with the notice dated 30 Sep 2014

Explanatory memorandum to the Renewable Energy Certificate for Renewable Energy Generation (Third Amendment) Regulations, 2014 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This document is CERC's explanatory memorandum for the draft Third Amendment to its REC Regulations, 2010. It explains why the amendment is proposed and reproduces the draft clauses (p1–17).

Part 1 introduces the principal REC Regulations notified on 14 January 2010, the two earlier amendments, the REC procedures, and the start of REC trading in March 2011 (p1). Part 2 reviews REC market trends: rising supply, weak demand, floor-price trading, large unsold inventory and weak RPO enforcement, leading FOR to commission a study and recommend changes at its 42nd meeting on 27.8.2014 (p2–3).

Part 3 proposes making distribution licensees eligible for RECs for renewable procurement above their RPO, subject to State Commission certification and an RPO floor, and sets out the draft amendment to Regulation 5 (p3–5). Part 4 examines the dominance of captive and open-access routes, compares electricity realisation under APPC, CGP and OA routes, and proposes a differential multiplier for non-APPC REC projects, with amendments to Regulation 7 (p5–10, p14–15).

Part 5 discusses floor and forbearance prices, the solar price mismatch, and proposes a vintage multiplier for solar projects for 12 years from commissioning (p10–16). Part 6 proposes an interim extension of REC validity by 365 days for certificates likely to expire within one year, while retaining the two-year overall validity (p16–17). Annexures give scenario tables for OA/CGP multipliers under commercial, industrial and average consumer tariffs (p18–20).

Standard name
REC Regulations
Primary topics
Renewable energy certificates (REC), Renewable purchase obligation (RPO / RCO)

Read with this

The regulation

Other copies of these documents (4)

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document