Skip to content

CERC · Central Electricity Regulatory Commission

Renewable Energy Certificate (Fifth Amendment) Regulations, 2015 — Explanatory Memorandum — Draft

Explanatory Memorandum for the "Draft Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) (FifthAmendment) Regulations, 2015"

Explanatory memorandum to a draftReleased with the notice dated 26 Jun 2015

Draft

Voltaic holds no final regulation made from this draft.

Explanatory memorandum to the Renewable Energy Certificate for Renewable Energy Generation (Fifth Amendment) Regulations, 2015 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's Explanatory Memorandum for the draft Fifth Amendment to the REC Regulations, 2010. It sets out the Commission's reasons and the exact text of proposed changes to Regulation 5 of the principal regulations; it is not itself the amending notification.

Part 1 (pp1–3) recounts the principal REC Regulations notified on 14 January 2010, three later amendments (29.9.2010, 10.07.2013 and 30.12.2014), and the start of REC trading in March 2011. It diagnoses a persistent surplus of unsold RECs and floor-price trading, attributing this to weak RPO enforcement and supply-side problems, particularly the large share of captive generating plants (CGPs). It recalls the Commission's direction, in the Third Amendment 2014 Statement of Reasons, to review CGP eligibility and open-access (OA) generator eligibility, and adds cogeneration to the review.

Part 2 (pp3–9) examines RE-based CGPs. It quotes earlier SoRs arguing that CGPs are already compensated through avoided retail tariffs, uses state-wise and route-wise registration data to show CGP dominance, and notes that about half of CGP projects predate the REC framework. The proposal (p8) is that a renewable CGP and a renewable plant not meeting CGP conditions but having self-consumption shall not be eligible for RECs for self-consumption energy. The draft amendment (p9) would delete the second to sixth provisos and explanation in Regulation 5(1)(c) and insert a new clause (1B).

Part 3 (pp9–12) addresses OA generators. It compares risk and contract tenor, then proposes that an OA seller availing concessional transmission/wheeling charges, banking facility benefit or concessional cross-subsidy surcharge must forgo those benefits to claim RECs. The draft provisos (pp11–12) make eligibility for the entire generation conditional on not availing such benefits, provide that eligibility starts only after the date of forgoing, refer disputes to the Appropriate Commission, and define 'banking facility benefit'. The memorandum closes with that Explanation; no commencement date is stated.

Standard name
REC Regulations
Primary topics
Renewable energy certificates (REC), Captive status, Open access

Read with this

The regulation

Other copies of these documents (4)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document