CERC · Central Electricity Regulatory Commission
Solar REC Floor and Forbearance Price Order, 2014
Determination of Forbearance and Floor Price for the Solar REC
Published with a draftDated 30 Sep 2014Petition No. SM/016/2014 (Suo Motu) dated 30th September, 2014
Draft
The draft has since been finalised as the Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — Third Amendment, 2014.
Published with the Renewable Energy Certificate for Renewable Energy Generation (Third Amendment) Regulations, 2014 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
A suo motu order of the Central Electricity Regulatory Commission (Petition No. SM/016/2014, dated 30 September 2014) proposing revised floor and forbearance prices for Solar Renewable Energy Certificates, and a vintage-based multiplier for solar projects, and inviting stakeholder comments before a final decision (p1, p4).
Pages 1–4 set out the existing REC price framework — one certificate per MWh injected into the grid, transacted within a floor and forbearance band fixed for a control period — and extract Regulation 9 of the REC Regulations and the guiding principles the Commission must apply, including variation in generation cost across technologies and States, variation in pooled cost of purchase, expected renewable capacity under preferential tariff and under certificates, and state RPO targets (p1–2). The order recalls two earlier suo motu determinations, for the control period to 31.03.2012 and for 1.04.2012–31.03.2017 (p2), then proposes solar REC floor and forbearance prices for projects commissioned on or after 1.4.2014 (p2–3). It proposes vintage multipliers that differ by sale route — sale to the local distribution licensee at pooled cost, sale to another licensee or open access consumer at a mutually agreed price, and self-consumption by a captive generating plant — tabulated by year of commissioning, to run for 12 years from commissioning and to be reviewed annually (p3). Comments are due by 30.10.2014 and the matter is listed for hearing on 4.11.2014 (p4).
The Annexure (pp5–12) is the supporting proposal: stakeholder concerns about bankability and revenue visibility beyond the control period, the mismatch between solar certificate prices and sharply falling solar PV tariffs, and the case for recognising project vintage (p5–6); the three issues framed for consideration (p6); the project-viability methodology for the new floor price, built on state-wise APPC, FIT and minimum viability requirement (p7–9); the methodology for the forbearance price, built on the state-wise gap between Commission-determined solar PV tariff and APPC (p9–10); and the vintage multiplier formulation with base year, minimum requirement and APPC, illustrated by year-wise tables (p10–12).
Read with this
The regulation
- Dated 14 Jan 2010Renewable Energy Certificate Regulations, 2010
Amendments and corrections
- Dated 29 Sep 2010REC (First Amendment) Regulations, 2010
- Dated 10 Jul 2013Renewable Energy Certificate (REC) (Second Amendment) Regulations, 2013
- Dated 30 Dec 2014Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — Third Amendment, 2014
- Dated 27 Jan 2015Corrigendum to the Notification dated 30 December 2014 on Solar RECs, January 2015
- Dated 23 Mar 2016Renewable Energy Certificate Regulations, 2010 — Fourth Amendment, 2016
- Dated 28 Mar 2016Renewable Energy Certificate Regulations, 2010 — Fourth Amendment, 2016
Commencement notices and reasons
- Dated 14 Jan 2010Renewable Energy Certificate Regulations, 2010 — Statement of Objects and Reasons
- Dated 27 Sep 2010Renewable Energy Certificate Regulations, 2010 — First Amendment — Statement of Objects and Reasons
- Dated 10 Jul 2013Renewable Energy Certificate (Second Amendment) Regulations, 2013 — Statement of Reasons
- Dated 30 Dec 2014Renewable Energy Certificate (Third Amendment) Regulations, 2014 — Statement of Reasons
- Dated 28 Mar 2016Renewable Energy Certificate Fourth Amendment Regulations, 2015 — Statement of Reasons
Procedures and orders made under it
- Dated 30 Dec 2014Determination of Forbearance and Floor Price for the Solar REC, 2014
- Date not statedDesignation of NLDC as Central Agency under the Renewable Energy Certificate Regulations
- Date not statedREC Procedures
Other copies of these documents (4)
- Dated 14 Jan 2010Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — as amended
- Dated 29 Sep 2010Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — First Amendment, 2010
- Dated 10 Jul 2013Renewable Energy Certificate Regulations, 2010 — Second Amendment, 2013
- Dated 30 Dec 2014Renewable Energy Certificate Regulations, 2010 — Third Amendment, 2014
Proposed changes (drafts with no final yet)
- Dated 26 Jun 2015Renewable Energy Certificate for Renewable Energy Generation (Fifth Amendment) Regulations, 2015 — Draft
- Dated 26 Jun 2015Public notice: Public Notice on Draft Renewable Energy Certificate (Fifth Amendment) Regulations, 2015
- Released with the notice dated 26 Jun 2015Explanatory memorandum: Renewable Energy Certificate (Fifth Amendment) Regulations, 2015 — Explanatory Memorandum — Draft
Earlier drafts
- Dated 2 Apr 2013Renewable Energy Certificate (Second Amendment) Regulations, 2013 — Draft
- Released with the notice dated 2 Apr 2013Explanatory memorandum: REC (Second Amendment) Regulations, 2012 — Explanatory Memorandum — Draft
- Dated 2 Apr 2013Public notice: REC (Second Amendment) Regulations, 2013 — Draft — Public Notice
- Dated 30 Sep 2014Renewable Energy Certificate for Renewable Energy Generation (Third Amendment) Regulations, 2014 — Draft
- Released with the notice dated 30 Sep 2014Explanatory memorandum: REC Third Amendment Regulations, 2014 — Explanatory Memorandum — Draft
- Dated 30 Sep 2014Public notice: Draft REC (Third Amendment) Regulations, 2014 and Solar REC Forbearance and Floor Price Order — Public Notice
- Released with the notice dated 31 Mar 2015Renewable Energy Certificate (Fourth Amendment) Regulations, 2015
- Dated 31 Mar 2015File: Proposed Framework for Forecasting, Scheduling & Imbalance Handling for Wind and Solar RE at Inter-State Level — Draft
- Dated 31 Mar 2015Public notice: Proposed Framework for Forecasting, Scheduling & Imbalance Handling for Wind and Solar RE Generating Stations at Inter-State Level — Public Notice, 2015
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.