CERC · Central Electricity Regulatory Commission
Renewable Energy Certificate Regulations, 2010 — Statement of Objects and Reasons
CERC (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010
Statement of reasonsDated 14 Jan 2010
Replaced by Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Renewable Energy Certificate Regulations, 2010 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is the Statement of Objects and Reasons for the CERC Renewable Energy Certificate Regulations, 2010. It is not the operative regulation; it explains why CERC proposed a national REC market and records how it dealt with stakeholder comments before publishing the revised draft in the Gazette (p16).
Part 1 (pp1–4) sets out the problem. The Electricity Act 2003 and National Electricity Policy require SERCs to promote renewable generation and specify RPOs, and NAPCC has set a rising renewable purchase target. But RE potential is uneven across states, so some SERCs set low RPOs or obligated entities cannot meet high RPOs locally. RECs are proposed as a market instrument to separate the electricity component from environmental attributes, so RPO compliance can be met by buying certificates (pp3–4, 17). The Forum of Regulators developed the framework, and CERC issued draft REC regulations in 2009 followed by a public hearing on 15 December 2009 (p4).
Parts 2–3 (pp5–16) record the Commission's issue-wise findings. CERC asserts jurisdiction under section 66, while noting SERCs' section 86(1)(e) role and FOR's model regulation (pp5–6). It clarifies that there will be one Central Agency with necessary technical capability, and no sub-delegation (pp6–8). It retains only solar and non-solar certificate categories and rejects solar multipliers or peak/off-peak categories (pp8–9). It limits issuance to RE generators; captive RE projects can get RECs for surplus above self-consumption; existing PPA projects are not to be encouraged to breach contracts (pp9–10). It accepts exclusion of RE cost from pooled power purchase cost, sets a fifteen-day registration decision with revocation and appeal (pp10–11). It keeps MWh denomination, allows fortnightly applications, fifteen-day issuance, and accumulation of sub-MWh generation (p12). REC trading stays only on CERC-approved power exchanges (p13). Pricing includes a floor/minimum price and forbearance price, with guiding principles for CERC fixation (pp13–14). It provides validity/extinction rules, fees for RE generators (not obligated entities), funding for state agency capacity building, and sample-based compliance auditors (pp14–16).
Annexure I (pp17–19) lists salient features: REC is for 1 MWh injected, issued only to RE generators, eligible grid-connected RE technologies with minimum 250 KW and MNRE approval, traded on power exchanges within floor and forbearance prices. Annexure II/III pages contain stakeholder comment tables and the public hearing participant list.
Read with this
The regulation
- Dated 14 Jan 2010Renewable Energy Certificate Regulations, 2010
Amendments and corrections
- Dated 29 Sep 2010REC (First Amendment) Regulations, 2010
- Dated 10 Jul 2013Renewable Energy Certificate (REC) (Second Amendment) Regulations, 2013
- Dated 30 Dec 2014Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — Third Amendment, 2014
- Dated 27 Jan 2015Corrigendum to the Notification dated 30 December 2014 on Solar RECs, January 2015
- Dated 23 Mar 2016Renewable Energy Certificate Regulations, 2010 — Fourth Amendment, 2016
- Dated 28 Mar 2016Renewable Energy Certificate Regulations, 2010 — Fourth Amendment, 2016
Commencement notices and reasons
- Dated 27 Sep 2010Renewable Energy Certificate Regulations, 2010 — First Amendment — Statement of Objects and Reasons
- Dated 10 Jul 2013Renewable Energy Certificate (Second Amendment) Regulations, 2013 — Statement of Reasons
- Dated 30 Dec 2014Renewable Energy Certificate (Third Amendment) Regulations, 2014 — Statement of Reasons
- Dated 28 Mar 2016Renewable Energy Certificate Fourth Amendment Regulations, 2015 — Statement of Reasons
Procedures and orders made under it
- Dated 30 Dec 2014Determination of Forbearance and Floor Price for the Solar REC, 2014
- Date not statedDesignation of NLDC as Central Agency under the Renewable Energy Certificate Regulations
- Date not statedREC Procedures
Other copies of these documents (4)
- Dated 14 Jan 2010Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — as amended
- Dated 29 Sep 2010Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — First Amendment, 2010
- Dated 10 Jul 2013Renewable Energy Certificate Regulations, 2010 — Second Amendment, 2013
- Dated 30 Dec 2014Renewable Energy Certificate Regulations, 2010 — Third Amendment, 2014
Proposed changes (drafts with no final yet)
- Dated 26 Jun 2015Renewable Energy Certificate for Renewable Energy Generation (Fifth Amendment) Regulations, 2015 — Draft
- Dated 26 Jun 2015Public notice: Public Notice on Draft Renewable Energy Certificate (Fifth Amendment) Regulations, 2015
- Released with the notice dated 26 Jun 2015Explanatory memorandum: Renewable Energy Certificate (Fifth Amendment) Regulations, 2015 — Explanatory Memorandum — Draft
Earlier drafts
- Dated 2 Apr 2013Renewable Energy Certificate (Second Amendment) Regulations, 2013 — Draft
- Released with the notice dated 2 Apr 2013Explanatory memorandum: REC (Second Amendment) Regulations, 2012 — Explanatory Memorandum — Draft
- Dated 2 Apr 2013Public notice: REC (Second Amendment) Regulations, 2013 — Draft — Public Notice
- Dated 30 Sep 2014Renewable Energy Certificate for Renewable Energy Generation (Third Amendment) Regulations, 2014 — Draft
- Released with the notice dated 30 Sep 2014Explanatory memorandum: REC Third Amendment Regulations, 2014 — Explanatory Memorandum — Draft
- Dated 30 Sep 2014File: Solar REC Floor and Forbearance Price Order, 2014
- Dated 30 Sep 2014Public notice: Draft REC (Third Amendment) Regulations, 2014 and Solar REC Forbearance and Floor Price Order — Public Notice
- Released with the notice dated 31 Mar 2015Renewable Energy Certificate (Fourth Amendment) Regulations, 2015
- Dated 31 Mar 2015File: Proposed Framework for Forecasting, Scheduling & Imbalance Handling for Wind and Solar RE at Inter-State Level — Draft
- Dated 31 Mar 2015Public notice: Proposed Framework for Forecasting, Scheduling & Imbalance Handling for Wind and Solar RE Generating Stations at Inter-State Level — Public Notice, 2015
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.