Skip to content

CERC · Central Electricity Regulatory Commission

Renewable Energy Certificate Regulations, 2010 — Statement of Objects and Reasons

CERC (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010

Statement of reasonsDated 14 Jan 2010

Replaced by Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Renewable Energy Certificate Regulations, 2010 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is the Statement of Objects and Reasons for the CERC Renewable Energy Certificate Regulations, 2010. It is not the operative regulation; it explains why CERC proposed a national REC market and records how it dealt with stakeholder comments before publishing the revised draft in the Gazette (p16).

Part 1 (pp1–4) sets out the problem. The Electricity Act 2003 and National Electricity Policy require SERCs to promote renewable generation and specify RPOs, and NAPCC has set a rising renewable purchase target. But RE potential is uneven across states, so some SERCs set low RPOs or obligated entities cannot meet high RPOs locally. RECs are proposed as a market instrument to separate the electricity component from environmental attributes, so RPO compliance can be met by buying certificates (pp3–4, 17). The Forum of Regulators developed the framework, and CERC issued draft REC regulations in 2009 followed by a public hearing on 15 December 2009 (p4).

Parts 2–3 (pp5–16) record the Commission's issue-wise findings. CERC asserts jurisdiction under section 66, while noting SERCs' section 86(1)(e) role and FOR's model regulation (pp5–6). It clarifies that there will be one Central Agency with necessary technical capability, and no sub-delegation (pp6–8). It retains only solar and non-solar certificate categories and rejects solar multipliers or peak/off-peak categories (pp8–9). It limits issuance to RE generators; captive RE projects can get RECs for surplus above self-consumption; existing PPA projects are not to be encouraged to breach contracts (pp9–10). It accepts exclusion of RE cost from pooled power purchase cost, sets a fifteen-day registration decision with revocation and appeal (pp10–11). It keeps MWh denomination, allows fortnightly applications, fifteen-day issuance, and accumulation of sub-MWh generation (p12). REC trading stays only on CERC-approved power exchanges (p13). Pricing includes a floor/minimum price and forbearance price, with guiding principles for CERC fixation (pp13–14). It provides validity/extinction rules, fees for RE generators (not obligated entities), funding for state agency capacity building, and sample-based compliance auditors (pp14–16).

Annexure I (pp17–19) lists salient features: REC is for 1 MWh injected, issued only to RE generators, eligible grid-connected RE technologies with minimum 250 KW and MNRE approval, traded on power exchanges within floor and forbearance prices. Annexure II/III pages contain stakeholder comment tables and the public hearing participant list.

Standard name
REC Regulations
Primary topics
Renewable energy certificates (REC), Renewable purchase obligation (RPO / RCO), Power markets and exchanges

Read with this

The regulation

Other copies of these documents (4)

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document