CERC · Central Electricity Regulatory Commission
Renewable Energy Certificate Regulations, 2010 — First Amendment — Statement of Objects and Reasons
The Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) (First Amendment) Regulations, 2010.
Statement of reasonsDated 27 Sep 2010
Replaced by Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Renewable Energy Certificate Regulations, 2010 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's Statement of Objects and Reasons for the First Amendment to the CERC (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010. It explains the policy concerns, sets out the proposed provisos to Regulation 5, records stakeholder comments and the Commission's findings, and directs publication of the amended regulations in the Gazette. It is not the notified amendment text itself.
The Introduction recalls that the principal REC Regulations were notified on 14 January 2010 to address the mismatch between renewable energy availability and renewable purchase obligations, and reproduces the existing Regulation 5 eligibility criteria for RE generators (p1). It identifies two concerns: that RE generators with preferential-tariff PPAs might breach contracts to earn REC revenue, and that renewable captive power producers (CPPs) might flood the REC market, especially through self-consumption (p1–2).
The draft amendment adds provisos to Regulation 5(1)(c) (p2). A generator that prematurely terminates a preferential-tariff PPA is barred from REC participation for three years from termination or until the scheduled PPA expiry, whichever is earlier, if an Appropriate Commission or competent court finds material breach. A renewable CPP is made eligible for its entire generation, including self-consumption, provided it has not availed or does not propose to avail concessional/promotional transmission or wheeling charges, banking benefit or electricity duty waiver; if it forgoes such benefits, a three-year wait applies; the bar falls away if the benefits are withdrawn by the SERC/State Government. Disputes go to the Appropriate Commission. Public comments were invited with a deadline of 17 September 2010 (p3).
The Commission's findings (p3–9) uphold PPA sanctity, locate REC eligibility and issuance with CERC and RPO recognition with SERCs, allow switching between REC and preferential tariff, confirm that only grid-connected RE is eligible, adopt consequential changes to Regulation 7 for deemed injection and certificate denomination, clarify part-PPA CPP eligibility and separate metering, explain REC/RPO treatment of self-consumption, define concessional transmission/wheeling charges and banking, remove “etc.” from the benefit list, and treat GBI/AD as not promotional. Annexure-1 lists stakeholders who commented (p10).
Read with this
The regulation
- Dated 14 Jan 2010Renewable Energy Certificate Regulations, 2010
Amendments and corrections
- Dated 29 Sep 2010REC (First Amendment) Regulations, 2010
- Dated 10 Jul 2013Renewable Energy Certificate (REC) (Second Amendment) Regulations, 2013
- Dated 30 Dec 2014Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — Third Amendment, 2014
- Dated 27 Jan 2015Corrigendum to the Notification dated 30 December 2014 on Solar RECs, January 2015
- Dated 23 Mar 2016Renewable Energy Certificate Regulations, 2010 — Fourth Amendment, 2016
- Dated 28 Mar 2016Renewable Energy Certificate Regulations, 2010 — Fourth Amendment, 2016
Commencement notices and reasons
- Dated 14 Jan 2010Renewable Energy Certificate Regulations, 2010 — Statement of Objects and Reasons
- Dated 10 Jul 2013Renewable Energy Certificate (Second Amendment) Regulations, 2013 — Statement of Reasons
- Dated 30 Dec 2014Renewable Energy Certificate (Third Amendment) Regulations, 2014 — Statement of Reasons
- Dated 28 Mar 2016Renewable Energy Certificate Fourth Amendment Regulations, 2015 — Statement of Reasons
Procedures and orders made under it
- Dated 30 Dec 2014Determination of Forbearance and Floor Price for the Solar REC, 2014
- Date not statedDesignation of NLDC as Central Agency under the Renewable Energy Certificate Regulations
- Date not statedREC Procedures
Other copies of these documents (4)
- Dated 14 Jan 2010Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — as amended
- Dated 29 Sep 2010Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — First Amendment, 2010
- Dated 10 Jul 2013Renewable Energy Certificate Regulations, 2010 — Second Amendment, 2013
- Dated 30 Dec 2014Renewable Energy Certificate Regulations, 2010 — Third Amendment, 2014
Proposed changes (drafts with no final yet)
- Dated 26 Jun 2015Renewable Energy Certificate for Renewable Energy Generation (Fifth Amendment) Regulations, 2015 — Draft
- Dated 26 Jun 2015Public notice: Public Notice on Draft Renewable Energy Certificate (Fifth Amendment) Regulations, 2015
- Released with the notice dated 26 Jun 2015Explanatory memorandum: Renewable Energy Certificate (Fifth Amendment) Regulations, 2015 — Explanatory Memorandum — Draft
Earlier drafts
- Dated 2 Apr 2013Renewable Energy Certificate (Second Amendment) Regulations, 2013 — Draft
- Released with the notice dated 2 Apr 2013Explanatory memorandum: REC (Second Amendment) Regulations, 2012 — Explanatory Memorandum — Draft
- Dated 2 Apr 2013Public notice: REC (Second Amendment) Regulations, 2013 — Draft — Public Notice
- Dated 30 Sep 2014Renewable Energy Certificate for Renewable Energy Generation (Third Amendment) Regulations, 2014 — Draft
- Released with the notice dated 30 Sep 2014Explanatory memorandum: REC Third Amendment Regulations, 2014 — Explanatory Memorandum — Draft
- Dated 30 Sep 2014File: Solar REC Floor and Forbearance Price Order, 2014
- Dated 30 Sep 2014Public notice: Draft REC (Third Amendment) Regulations, 2014 and Solar REC Forbearance and Floor Price Order — Public Notice
- Released with the notice dated 31 Mar 2015Renewable Energy Certificate (Fourth Amendment) Regulations, 2015
- Dated 31 Mar 2015File: Proposed Framework for Forecasting, Scheduling & Imbalance Handling for Wind and Solar RE at Inter-State Level — Draft
- Dated 31 Mar 2015Public notice: Proposed Framework for Forecasting, Scheduling & Imbalance Handling for Wind and Solar RE Generating Stations at Inter-State Level — Public Notice, 2015
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.