Renewable Energy Certificate Regulations, 2010 — First Amendment — Statement of Objects and Reasons

The Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) (First Amendment) Regulations, 2010.

Statement of reasonsDated 27 Sep 2010

Replaced by Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Renewable Energy Certificate Regulations, 2010 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's Statement of Objects and Reasons for the First Amendment to the CERC (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010. It explains the policy concerns, sets out the proposed provisos to Regulation 5, records stakeholder comments and the Commission's findings, and directs publication of the amended regulations in the Gazette. It is not the notified amendment text itself.

The Introduction recalls that the principal REC Regulations were notified on 14 January 2010 to address the mismatch between renewable energy availability and renewable purchase obligations, and reproduces the existing Regulation 5 eligibility criteria for RE generators (p1). It identifies two concerns: that RE generators with preferential-tariff PPAs might breach contracts to earn REC revenue, and that renewable captive power producers (CPPs) might flood the REC market, especially through self-consumption (p1–2).

The draft amendment adds provisos to Regulation 5(1)(c) (p2). A generator that prematurely terminates a preferential-tariff PPA is barred from REC participation for three years from termination or until the scheduled PPA expiry, whichever is earlier, if an Appropriate Commission or competent court finds material breach. A renewable CPP is made eligible for its entire generation, including self-consumption, provided it has not availed or does not propose to avail concessional/promotional transmission or wheeling charges, banking benefit or electricity duty waiver; if it forgoes such benefits, a three-year wait applies; the bar falls away if the benefits are withdrawn by the SERC/State Government. Disputes go to the Appropriate Commission. Public comments were invited with a deadline of 17 September 2010 (p3).

The Commission's findings (p3–9) uphold PPA sanctity, locate REC eligibility and issuance with CERC and RPO recognition with SERCs, allow switching between REC and preferential tariff, confirm that only grid-connected RE is eligible, adopt consequential changes to Regulation 7 for deemed injection and certificate denomination, clarify part-PPA CPP eligibility and separate metering, explain REC/RPO treatment of self-consumption, define concessional transmission/wheeling charges and banking, remove “etc.” from the benefit list, and treat GBI/AD as not promotional. Annexure-1 lists stakeholders who commented (p10).

Standard name
REC Regulations
Primary topics
Renewable energy certificates (REC), Renewable purchase obligation (RPO / RCO), Energy banking

Read with this

The regulation

Other copies of these documents (4)

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document