Renewable Energy Certificate Fourth Amendment Regulations, 2015 — Statement of Reasons

The Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) (Fourth Amendment) Regulations, 2015.

Statement of reasonsDated 28 Mar 2016

Replaced by Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Renewable Energy Certificate Regulations, 2010 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 31 of 40. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's Statement of Reasons Order dated 28 March 2016 for the Fourth Amendment to the REC Regulations, dealing with two eligibility questions: open-access RE generators and RE captive generating plants (p1–2). It records the consultation on the draft Fourth Amendment: public notice No.L-1/94/CERC/2011 dated 26 June 2015, 63 written submissions (Annexure I), and a public hearing on 5 August 2015 (Annexure II) (p2). It also notes that the draft was first numbered as the Fifth Amendment but was renumbered Fourth after the proposed Fourth Amendment was revoked (p2).

Section 3 (pp3–16) addresses RE generators selling the electricity component to third parties through open access. It reproduces the draft provisos to Regulation 5(1)(c) that would allow full-generation REC eligibility only if the generator does not avail concessional/promotional transmission or wheeling charges, banking facility, or concessional cross-subsidy surcharge (p3). Stakeholders largely opposed the condition as unviable and retrospective, and argued that RPO non-enforcement, not open-access generators, caused the REC surplus (pp3–12). In its analysis, the Commission drops cross-subsidy surcharge from the disqualifying benefits because CSS varies by state and the proposed Electricity Act amendment would waive it for RE open-access users (pp12–13). The final text adds provisos at the end of Regulation 5(1)(c): no concessional/promotional transmission or wheeling charges and no banking facility benefit; eligibility after the date of forgoing such benefits; the condition does not apply if the benefit is withdrawn by the SERC or State Government; disputes go to the Appropriate Commission; and an Explanation defines 'banking facility benefit' (pp15–16).

Section 4 turns to RE CGPs. The draft would delete the existing second-to-sixth provisos and insert Clause (IB), making a renewable-energy CGP and any self-consuming RE plant ineligible for RECs to the extent of self-consumption (p16). The rest of the supplied text records stakeholder comments opposing the exclusion: they say it is retrospective, undermines projects that factored in REC revenue, hurts group-captive and multi-state RPO compliance models, and misdiagnoses the REC surplus, which they attribute to weak RPO enforcement (pp16–31).

Standard name
REC Regulations
Primary topics
Renewable energy certificates (REC), Open access, Captive status

Read with this

The regulation

Other copies of these documents (4)

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document