CERC · Central Electricity Regulatory Commission
Renewable Energy Certificate Fourth Amendment Regulations, 2015 — Statement of Reasons
The Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) (Fourth Amendment) Regulations, 2015.
Statement of reasonsDated 28 Mar 2016
Replaced by Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Renewable Energy Certificate Regulations, 2010 or one of its amendments.
Summary
Summary written by software, from pages 1 to 31 of 40. Check the regulator's original before you rely on it.
This is the Central Electricity Regulatory Commission's Statement of Reasons Order dated 28 March 2016 for the Fourth Amendment to the REC Regulations, dealing with two eligibility questions: open-access RE generators and RE captive generating plants (p1–2). It records the consultation on the draft Fourth Amendment: public notice No.L-1/94/CERC/2011 dated 26 June 2015, 63 written submissions (Annexure I), and a public hearing on 5 August 2015 (Annexure II) (p2). It also notes that the draft was first numbered as the Fifth Amendment but was renumbered Fourth after the proposed Fourth Amendment was revoked (p2).
Section 3 (pp3–16) addresses RE generators selling the electricity component to third parties through open access. It reproduces the draft provisos to Regulation 5(1)(c) that would allow full-generation REC eligibility only if the generator does not avail concessional/promotional transmission or wheeling charges, banking facility, or concessional cross-subsidy surcharge (p3). Stakeholders largely opposed the condition as unviable and retrospective, and argued that RPO non-enforcement, not open-access generators, caused the REC surplus (pp3–12). In its analysis, the Commission drops cross-subsidy surcharge from the disqualifying benefits because CSS varies by state and the proposed Electricity Act amendment would waive it for RE open-access users (pp12–13). The final text adds provisos at the end of Regulation 5(1)(c): no concessional/promotional transmission or wheeling charges and no banking facility benefit; eligibility after the date of forgoing such benefits; the condition does not apply if the benefit is withdrawn by the SERC or State Government; disputes go to the Appropriate Commission; and an Explanation defines 'banking facility benefit' (pp15–16).
Section 4 turns to RE CGPs. The draft would delete the existing second-to-sixth provisos and insert Clause (IB), making a renewable-energy CGP and any self-consuming RE plant ineligible for RECs to the extent of self-consumption (p16). The rest of the supplied text records stakeholder comments opposing the exclusion: they say it is retrospective, undermines projects that factored in REC revenue, hurts group-captive and multi-state RPO compliance models, and misdiagnoses the REC surplus, which they attribute to weak RPO enforcement (pp16–31).
Read with this
The regulation
- Dated 14 Jan 2010Renewable Energy Certificate Regulations, 2010
Amendments and corrections
- Dated 29 Sep 2010REC (First Amendment) Regulations, 2010
- Dated 10 Jul 2013Renewable Energy Certificate (REC) (Second Amendment) Regulations, 2013
- Dated 30 Dec 2014Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — Third Amendment, 2014
- Dated 27 Jan 2015Corrigendum to the Notification dated 30 December 2014 on Solar RECs, January 2015
- Dated 23 Mar 2016Renewable Energy Certificate Regulations, 2010 — Fourth Amendment, 2016
- Dated 28 Mar 2016Renewable Energy Certificate Regulations, 2010 — Fourth Amendment, 2016
Commencement notices and reasons
- Dated 14 Jan 2010Renewable Energy Certificate Regulations, 2010 — Statement of Objects and Reasons
- Dated 27 Sep 2010Renewable Energy Certificate Regulations, 2010 — First Amendment — Statement of Objects and Reasons
- Dated 10 Jul 2013Renewable Energy Certificate (Second Amendment) Regulations, 2013 — Statement of Reasons
- Dated 30 Dec 2014Renewable Energy Certificate (Third Amendment) Regulations, 2014 — Statement of Reasons
Procedures and orders made under it
- Dated 30 Dec 2014Determination of Forbearance and Floor Price for the Solar REC, 2014
- Date not statedDesignation of NLDC as Central Agency under the Renewable Energy Certificate Regulations
- Date not statedREC Procedures
Other copies of these documents (4)
- Dated 14 Jan 2010Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — as amended
- Dated 29 Sep 2010Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — First Amendment, 2010
- Dated 10 Jul 2013Renewable Energy Certificate Regulations, 2010 — Second Amendment, 2013
- Dated 30 Dec 2014Renewable Energy Certificate Regulations, 2010 — Third Amendment, 2014
Proposed changes (drafts with no final yet)
- Dated 26 Jun 2015Renewable Energy Certificate for Renewable Energy Generation (Fifth Amendment) Regulations, 2015 — Draft
- Dated 26 Jun 2015Public notice: Public Notice on Draft Renewable Energy Certificate (Fifth Amendment) Regulations, 2015
- Released with the notice dated 26 Jun 2015Explanatory memorandum: Renewable Energy Certificate (Fifth Amendment) Regulations, 2015 — Explanatory Memorandum — Draft
Earlier drafts
- Dated 2 Apr 2013Renewable Energy Certificate (Second Amendment) Regulations, 2013 — Draft
- Released with the notice dated 2 Apr 2013Explanatory memorandum: REC (Second Amendment) Regulations, 2012 — Explanatory Memorandum — Draft
- Dated 2 Apr 2013Public notice: REC (Second Amendment) Regulations, 2013 — Draft — Public Notice
- Dated 30 Sep 2014Renewable Energy Certificate for Renewable Energy Generation (Third Amendment) Regulations, 2014 — Draft
- Released with the notice dated 30 Sep 2014Explanatory memorandum: REC Third Amendment Regulations, 2014 — Explanatory Memorandum — Draft
- Dated 30 Sep 2014File: Solar REC Floor and Forbearance Price Order, 2014
- Dated 30 Sep 2014Public notice: Draft REC (Third Amendment) Regulations, 2014 and Solar REC Forbearance and Floor Price Order — Public Notice
- Released with the notice dated 31 Mar 2015Renewable Energy Certificate (Fourth Amendment) Regulations, 2015
- Dated 31 Mar 2015File: Proposed Framework for Forecasting, Scheduling & Imbalance Handling for Wind and Solar RE at Inter-State Level — Draft
- Dated 31 Mar 2015Public notice: Proposed Framework for Forecasting, Scheduling & Imbalance Handling for Wind and Solar RE Generating Stations at Inter-State Level — Public Notice, 2015
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.