CERC · Central Electricity Regulatory Commission

REC Procedures

ProcedureDate not stated

Replaced by Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Renewable Energy Certificate Regulations, 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 45 of 83. Check the regulator's original before you rely on it.

P1 is not present) contains the two annexures of the REC procedures that implement the CERC (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010. Annexure-I (pp2–30) is the model procedure/guidelines for State Agencies to accredit renewable energy generation projects and distribution licensees under the REC mechanism. It states the objective and enabling provisions (p2), defines applicability and eligibility—grid-connected RE projects including CGP, and distribution licensees that have procured RE above the applicable RPO threshold (pp2–4)—then sets out an eight-step accreditation process from web/physical application through scrutiny, verification, fee payment, certificate issue and intimation to the Central Agency, SLDC and DISCOM (pp4–6). It allocates roles to applicants and State Agencies (pp6–8), lists application contents (pp8–9), prescribes certificate and recommendation formats (p9, pp27–30), sets timelines including a 30-working-day normal completion target (p9), leaves fee heads blank for CERC/SERC determination (pp9–10), and covers events of default, revocation, and powers to remove difficulties (pp10–11).

Annexure-II (pp31–45+) is the Central Agency procedure for registering accredited projects/distribution licensees as Eligible Entities. It covers scope and five-year registration validity (pp31–32), an eight-step registration process (pp32–35), roles and responsibilities (pp36–38), application contents (pp38–39), registration certificate (p39), timelines (pp39–40), fees and charges with reference to CERC’s 21.09.2010 fees order (pp40–41), default and revocation with appeal to CERC (pp41–42), de-registration/capacity reduction (pp42–43), and powers to remove difficulties (p43). Format 2.1 begins at p44.

Standard name
REC Regulations
Primary topics
Renewable energy certificates (REC), Renewable purchase obligation (RPO / RCO), Captive status

Read with this

The regulation

Other copies of these documents (4)

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document