CERC · Central Electricity Regulatory Commission

Renewable Energy Certificate Regulations, 2010 — Fourth Amendment, 2016

Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) (Fourth Amendment) Regulations, 2016

AmendmentDated 28 Mar 2016No. L-1/12/2010-CERC dated 28 th March, 2016

Replaced by Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Renewable Energy Certificate Regulations, 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

What it is. A CERC notification dated 28 March 2016 (No. L-1/12/2010-CERC) making the Fourth Amendment to the CERC (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010. It is made under s.178 of the Electricity Act, 2003 and comes into force on publication in the Official Gazette; the Gazette date is not printed (p1).

Clause 2 — Regulation 5 (who may participate in the REC scheme). It deletes the second to sixth provisos and the explanation under Regulation 5(1)(c) and inserts fresh provisos in their place. The result is a self-contained eligibility rule for renewable generators selling the electricity component to a third party through open access: RECs on the entire generation are available only if the generator does not avail — or propose to avail — concessional/promotional transmission or wheeling charges or banking facility benefit. Where the generator forgoes such benefits voluntarily, eligibility begins only from the date of forgoing. The restriction does not apply where the SERC or State Government withdraws the benefits, and disputes over whether benefits were availed go to the Appropriate Commission. "Banking facility benefit" is defined narrowly, as banking that lets a generator use banked energy at any time including peak hours despite off-peak injection (p1–2).

Clause 2(3) — new Clause (1B). It covers captive generating plants and self-consumption renewable plants that do not meet the Electricity Rules, 2005 CGP test, barring RECs for self-consumed energy unless the plant was commissioned between 29 September 2010 and 31 March 2016 and registered with the Central Agency by 30 June 2016. Eligible plants must still avoid concessional transmission/wheeling or banking benefits, and face a three-year wait after voluntarily forgoing them — longer than the "date of forgoing" rule for open-access generators — with the same withdrawal exception and dispute route (p2–3).

Clause 3 — Regulation 8(3). Substituted so that an eligible renewable generator, including an eligible CGP, may retain certificates to offset its own renewable purchase obligation as a consumer, subject to certification and verification by the concerned State Agency (p3).

Note (p3) recites the Principal Regulations and the earlier First to Third Amendment Regulations and corrigendum with Gazette citations.

Standard name
REC Regulations
Primary topics
Renewable energy certificates (REC), Open access, Captive status

Read with this

The regulation

Other copies of these documents (4)

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.