Skip to content

CERC · Central Electricity Regulatory Commission

Renewable Energy Certificate (REC) (Second Amendment) Regulations, 2013

Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) (Second Amendment) Regulations, 2013

AmendmentDated 10 Jul 2013No.L‐1/12/2010‐CERC dated 10th of July, 2013

Replaced by Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Renewable Energy Certificate Regulations, 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's Second Amendment to its Renewable Energy Certificate Regulations, 2010, notified on 10 July 2013 (p1). Seven operative clauses rewrite the eligibility, application, trading and validity rules of the REC scheme. It takes effect from publication in the Official Gazette, whose date is not printed (p1).

Clause 2 deletes a definition from Regulation 2 of the principal regulations (p1). Clause 3 reworks Regulation 5, the core eligibility test: it restates the bar on plants selling to an obligated entity under a section 62 or 63 tariff, adds a co-generation capacity proviso, tightens the price reference for other sales to the pooled cost of power purchase as determined by the Appropriate Commission, and replaces the provisos with conditions covering a three-year REC bar after premature termination found to be a material breach, captive generating plant eligibility for self-consumption, forgoing concessional transmission/wheeling and banking benefits, the three-year wait where a CGP voluntarily gives them up, the position where a SERC or State Government withdraws them, and referral of disputes to the Appropriate Commission. An Explanation defines 'banking facility benefit' (p2–3). A new Regulation 5(1)(d) bars sales to obligated entities for RPO compliance (p4).

Clause 4 changes the application window (six months from the corresponding generation, with filings on the 10th, 20th and last day of the month) and swaps 'captive power producer' for 'captive generating plant' (p4). Clause 5 confines certificate dealing to power exchanges and creates a route for generators to retain certificates to offset their own consumer RPO with State Agency verification (p4–5). Clauses 6 and 7 replace 'preferential tariff' with the section 62/63 tariff formulation and set when eligibility begins, how long certificates stay valid, and what happens to certificates where accreditation is obtained on false information or revoked (p5–6). A closing Note records the publication of the principal regulations and the first amendment (p6).

Standard name
REC Regulations
Primary topics
Renewable energy certificates (REC), Renewable purchase obligation (RPO / RCO), Power markets and exchanges

Read with this

The regulation

Other copies of these documents (4)

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document