Skip to content

CERC · Central Electricity Regulatory Commission

Renewable Energy Certificate for Renewable Energy Generation (Fifth Amendment) Regulations, 2015 — Draft

Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) (Fifth Amendment) Regulations, 2015

Draft amendmentDated 26 Jun 2015No. L-1/12/2010-CERC dated 26th June, 2015

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the draft of the Fifth Amendment to the CERC Renewable Energy Certificate (REC) Regulations, 2010, issued by the Central Electricity Regulatory Commission on 26 June 2015 under Section 178 of the Electricity Act, 2003 (p1). It is short and narrow in scope: it does not touch prices, procedures or the certificate machinery, but rewrites the eligibility gate at Regulation 5 of the Principal Regulations.

Paragraph 1 gives the short title and provides that the regulations take effect from publication in the Official Gazette (p1). Paragraph 2 makes three changes. First, it deletes the second to sixth provisos, together with the explanation, under sub-clause (c) of Regulation 5(1) (p1). Second, it inserts replacement provisos making a renewable energy generator that sells its electricity component to a third party through open access eligible for the REC scheme in respect of the entire energy generated, conditional on the generator not having availed — or proposing to avail — concessional or promotional transmission or wheeling charges, banking facility benefit, or concessional cross subsidy surcharge; a generator that forgoes those benefits on its own becomes eligible only from the date it does so, and disputes over whether benefits were availed go to the Appropriate Commission (p1). Third, it inserts a new Clause (IB) that bars renewable-energy captive generating plants, and renewable-energy plants that do not satisfy the Electricity Rules, 2005 captive test but have self-consumption, from the REC scheme to the extent of self-consumption (p2).

An Explanation defines "banking facility benefit" narrowly, as banking that lets a generator draw banked energy at any time, including peak hours, after injecting during off-peak hours (p2). A closing Note recites the Principal Regulations and the amendments already made to them (p2). The text is drafted as final regulation language but is captioned a draft notification, so its operative status depends on later gazette publication.

Standard name
REC Regulations
Primary topics
Renewable energy certificates (REC)

Read with this

The regulation

Other copies of these documents (4)

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document