CERC · Central Electricity Regulatory Commission

REC (First Amendment) Regulations, 2010

Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) (First Amendment) Regulations, 2010

AmendmentDated 29 Sep 2010No. L‐1/12/2010‐CERC dated 29th September, 2010

Replaced by Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Renewable Energy Certificate Regulations, 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's First Amendment to its Renewable Energy Certificate (REC) regulations, issued on 29 September 2010 under section 178 of the Electricity Act, 2003 (p1). It rewrites who may claim RECs and how certificate volumes are counted.

Regulation 2 adds four provisos to Regulation 5(1)(c) (p1–2). A generating company that sold power under a preferential-tariff power purchase agreement and terminated it prematurely is barred from the REC scheme for three years from termination, or until the agreement's scheduled expiry, whichever is earlier, if an Appropriate Commission or competent court has ruled against it for material breach. A renewable-energy captive power producer (CPP) may claim RECs on its entire generation, including self-consumption, provided it has not taken concessional or promotional transmission or wheeling charges, banking facility benefit or a waiver of electricity duty. A CPP that voluntarily forgoes those benefits must wait three years from forgoing them. The CPP condition falls away where a State Electricity Regulatory Commission or State Government withdraws the benefits. Disputes over whether benefits were availed go to the Appropriate Commission, and an Explanation narrows 'banking facility benefit' to banking that lets the CPP use banked energy at any time, including peak hours, despite off-peak injection (p2).

Regulation 3 amends Regulation 7 so that a CPP's self-consumed energy is treated as injected into the grid, with each certificate still representing one megawatt hour injected or deemed injected (p2). Commencement is tied to Gazette publication, a date not printed here; the Note separately records that the principal regulations were published on 18.1.2010 (p2).

Standard name
REC Regulations
Primary topics
Renewable energy certificates (REC), Energy banking

Read with this

The regulation

Other copies of these documents (4)

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document