Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — Third Amendment, 2014

Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) (Third Amendment) Regulations, 2014

AmendmentDated 30 Dec 2014In force from 1 Jan 2015No.L- 1/12/2010-CERC dated 30th December, 2014

Replaced by Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Renewable Energy Certificate Regulations, 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's Third Amendment to its 2010 Renewable Energy Certificate regulations, dated 30 December 2014 and brought into force from 1 January 2015 (p1).

The headline change opens the REC framework to distribution licensees. A new Regulation 5(1A) makes a distribution licensee eligible to register with the Central Agency if it has procured renewable energy in the previous financial year at a Section 62 tariff or a Section 63-adopted tariff in excess of the highest of the RPO set by the Appropriate Commission, the National Action Plan on Climate Change or the Tariff Policy, and holds a certification from the Appropriate Commission to that effect. Provisos require that the RPO specified for a year not fall below the previous year's, and that shortfalls against solar or non-solar obligations over the previous three years — including waived or carried-forward shortfalls — be adjusted first (p1–2).

Regulation 7 amendments sort out the application route: the ordinary route is closed to distribution licensees, a new clause gives eligible distribution licensees three months from certification to apply to the Central Agency for Certificates, and new clauses (7) and (8) create a vintage multiplier for solar generating companies registered before 1 January 2015, computed as base-year floor price divided by current-year floor price, applied from 1 January 2015 to 31 March 2017, after which such projects return to one REC per megawatt hour (p2–3).

Regulation 10 is rewritten so Certificates are valid for 1,095 days from issuance, with RECs that expired in FY 2014-15 and those issued up to the commencement of this amendment remaining valid for 1,095 days or until 31 March 2017, whichever is later, and with Certificates staying valid even if the entity's accreditation is later revoked (p3). A closing note records the Gazette publication references of the principal regulations and the first two amendments (p3).

Standard name
REC Regulations
Primary topics
Renewable energy certificates (REC), Renewable purchase obligation (RPO / RCO)

Read with this

The regulation

Other copies of these documents (4)

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document