Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — First Amendment, 2010

Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) (First Amendment) Regulations, 2010

Amendment · Gazette copyDated 29 Sep 2010Published in the Gazette 1 Oct 2010No. L-1/12/2010-CERC dated 29th September, 2010

Replaced by Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the REC (First Amendment) Regulations, 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short amending instrument issued by the Central Electricity Regulatory Commission under section 178 of the Electricity Act, 2003, notified on 29 September 2010 and published in the Gazette of India (Extraordinary, Part III—Section 4, No. 249) on 1 October 2010 (p1, p3). It amends the CERC (Terms and Conditions for Recognition and Issuance of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010 — called "the principal regulations" — and takes effect from the date of gazette publication (p3).

Regulation 2 inserts four provisos into Regulation 5(1)(c) of the principal regulations, tightening who may participate in the REC scheme (p3–4). A generating company that has sold electricity under a preferential-tariff power purchase agreement and whose agreement is terminated prematurely is barred from the REC scheme for a defined period where a Commission or competent court has found it in material breach, with the bar ending at whichever of two dates comes first. Captive power producers based on renewable sources are made eligible to count the entire generation of the plant, including self-consumption, subject to their not having taken (or proposing not to take) concessional or promotional transmission or wheeling charges, banking facility benefit, or waiver of electricity duty; a CPP that voluntarily gives up such benefits must wait a defined period before becoming eligible, and the restriction falls away if the State Commission or State Government withdraws the benefits. Disputes over whether benefits were availed go to the Appropriate Commission, and an Explanation defines "banking facility benefit" narrowly (p4).

Regulation 3 amends Regulation 7: self-consumption by an eligible captive producer is treated as deemed injection into the grid for issuing certificates, and sub-regulation (6) is substituted so that each certificate represents a stated quantum of renewable electricity generated and injected or deemed injected (p4). A closing Note records the publication details of the principal regulations (p4).

Standard name
REC Regulations
Primary topics
Renewable energy certificates (REC), Captive status

Read with this

The regulation

Other copies of these documents (3)

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document