CERC · Central Electricity Regulatory Commission
REC (Second Amendment) Regulations, 2012 — Explanatory Memorandum — Draft
Explanatory Memorandum for the "Draft Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) (Second Amendment) Regulations, 2012"
Explanatory memorandum to a draftReleased with the notice dated 2 Apr 2013
Draft
The draft has since been finalised as the Renewable Energy Certificate (REC) (Second Amendment) Regulations, 2013.
Explanatory memorandum to the Renewable Energy Certificate (Second Amendment) Regulations, 2013 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is CERC's explanatory memorandum for the draft CERC (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) (Second Amendment) Regulations, 2012. It explains why the Commission proposes to amend the 2010 principal REC Regulations (notified 14 January 2010) and the first amendment of 29 September 2010, and reproduces the proposed amendment clauses. It is a statement of reasons, not the notified amendment itself.
Section 1 (p1–3) sets out the background: the REC mechanism is meant to address the mismatch between renewable energy availability and RPO compliance, but demand is driven mainly by captive plants and open access consumers, leaving uncleared REC volumes. It lists the issues to be addressed. Section 2 (p3–4) proposes to delete the definition of "preferential tariff" and to bar RECs for generators selling under PPAs at tariffs determined under section 62 or adopted under section 63, to avoid double counting green attributes. Section 3 (p4–6) proposes a special dispensation for bagasse-based cogeneration, counting connected load capacity as captive consumption despite seasonal PPA variations. Section 4 (p6–7) proposes changing the APPC wording from "not exceeding pooled cost" to "at the pooled cost" as determined by the Appropriate Commission. Section 5 (p8) proposes removing waiver of electricity duty as a disqualification and replacing "CPP" with "CGP". Section 6 (p8–12) proposes detailed conditions for CGPs and non-CGP renewable generators, including forgoing concessional transmission/wheeling and banking benefits and three-year waiting periods. Section 7 (p12–13) extends the REC application period from three to six months and changes application days. Section 8 (p13) removes the minimum capacity requirement for registration. Section 9 (p14–15) allows CGPs to retain certificates for their own RPO. Section 10 (p15–16) extends REC validity to 730 days. Section 11 (p16) clarifies issuance from commercial operation or registration, whichever is later.
Read with this
The regulation
- Dated 14 Jan 2010Renewable Energy Certificate Regulations, 2010
Amendments and corrections
- Dated 29 Sep 2010REC (First Amendment) Regulations, 2010
- Dated 10 Jul 2013Renewable Energy Certificate (REC) (Second Amendment) Regulations, 2013
- Dated 30 Dec 2014Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — Third Amendment, 2014
- Dated 27 Jan 2015Corrigendum to the Notification dated 30 December 2014 on Solar RECs, January 2015
- Dated 23 Mar 2016Renewable Energy Certificate Regulations, 2010 — Fourth Amendment, 2016
- Dated 28 Mar 2016Renewable Energy Certificate Regulations, 2010 — Fourth Amendment, 2016
Commencement notices and reasons
- Dated 14 Jan 2010Renewable Energy Certificate Regulations, 2010 — Statement of Objects and Reasons
- Dated 27 Sep 2010Renewable Energy Certificate Regulations, 2010 — First Amendment — Statement of Objects and Reasons
- Dated 10 Jul 2013Renewable Energy Certificate (Second Amendment) Regulations, 2013 — Statement of Reasons
- Dated 30 Dec 2014Renewable Energy Certificate (Third Amendment) Regulations, 2014 — Statement of Reasons
- Dated 28 Mar 2016Renewable Energy Certificate Fourth Amendment Regulations, 2015 — Statement of Reasons
Procedures and orders made under it
- Dated 30 Dec 2014Determination of Forbearance and Floor Price for the Solar REC, 2014
- Date not statedDesignation of NLDC as Central Agency under the Renewable Energy Certificate Regulations
- Date not statedREC Procedures
Other copies of these documents (4)
- Dated 14 Jan 2010Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — as amended
- Dated 29 Sep 2010Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — First Amendment, 2010
- Dated 10 Jul 2013Renewable Energy Certificate Regulations, 2010 — Second Amendment, 2013
- Dated 30 Dec 2014Renewable Energy Certificate Regulations, 2010 — Third Amendment, 2014
Proposed changes (drafts with no final yet)
- Dated 26 Jun 2015Renewable Energy Certificate for Renewable Energy Generation (Fifth Amendment) Regulations, 2015 — Draft
- Dated 26 Jun 2015Public notice: Public Notice on Draft Renewable Energy Certificate (Fifth Amendment) Regulations, 2015
- Released with the notice dated 26 Jun 2015Explanatory memorandum: Renewable Energy Certificate (Fifth Amendment) Regulations, 2015 — Explanatory Memorandum — Draft
Earlier drafts
- Dated 2 Apr 2013Renewable Energy Certificate (Second Amendment) Regulations, 2013 — Draft
- Dated 2 Apr 2013Public notice: REC (Second Amendment) Regulations, 2013 — Draft — Public Notice
- Dated 30 Sep 2014Renewable Energy Certificate for Renewable Energy Generation (Third Amendment) Regulations, 2014 — Draft
- Released with the notice dated 30 Sep 2014Explanatory memorandum: REC Third Amendment Regulations, 2014 — Explanatory Memorandum — Draft
- Dated 30 Sep 2014File: Solar REC Floor and Forbearance Price Order, 2014
- Dated 30 Sep 2014Public notice: Draft REC (Third Amendment) Regulations, 2014 and Solar REC Forbearance and Floor Price Order — Public Notice
- Released with the notice dated 31 Mar 2015Renewable Energy Certificate (Fourth Amendment) Regulations, 2015
- Dated 31 Mar 2015File: Proposed Framework for Forecasting, Scheduling & Imbalance Handling for Wind and Solar RE at Inter-State Level — Draft
- Dated 31 Mar 2015Public notice: Proposed Framework for Forecasting, Scheduling & Imbalance Handling for Wind and Solar RE Generating Stations at Inter-State Level — Public Notice, 2015
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.