Skip to content

CERC · Central Electricity Regulatory Commission

Draft REC (Third Amendment) Regulations, 2014 and Solar REC Forbearance and Floor Price Order — Public Notice

Draft Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) (Third Amendment) Regulations, 2014 and Order on determination of Forbearance and Floor Price for the Solar REC

Public notice on a draftDated 30 Sep 2014No. L-1/12/2010-CERC dated 30th September, 2014

Public notice on the Renewable Energy Certificate for Renewable Energy Generation (Third Amendment) Regulations, 2014 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page public notice issued by the Central Electricity Regulatory Commission on 30 September 2014 (No. L-1/12/2010-CERC) and signed by its Secretary (p1–2). It announces two things at once: that the Commission has made draft CERC (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) (Third Amendment) Regulations, 2014 under section 178 of the Electricity Act, 2003, and that it has issued a suo-motu order of the same date (Petition No. SM/016/2014) determining the forbearance price and floor price for the Solar REC (p1).

The notice is itself procedural. It gives notice under section 178(3) of the Act read with section 23 of the General Clauses Act, 1897 that comments, suggestions and objections on both the draft regulations and the order may be sent to the Secretary by 30 October 2014, and warns that comments arriving after that date may not be considered when the regulations are finalised (p1). It convenes a public hearing on 4 November 2014, asks organisations to communicate the names of one or two officers fully conversant with the subject by 30 October 2014, and asks whether they intend to make a presentation — suggesting a duration of 5–10 minutes and no more than 8–10 slides (p1–2).

The substance sits outside the notice: the draft amendment regulations, an explanatory memorandum and the suo-motu price order are stated to be annexed and downloadable (p1). Read this notice as the consultation wrapper and timetable, not as the operative text.

Standard name
REC Regulations
Primary topics
Renewable energy certificates (REC)

Read with this

The regulation

Other copies of these documents (4)

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document