Skip to content

CERC · Central Electricity Regulatory Commission

Proposed Framework for Forecasting, Scheduling & Imbalance Handling for Wind and Solar RE at Inter-State Level — Draft

Proposed Framework for Forecasting, Scheduling & Imbalance Handling for Renewable Energy (RE) Generating Stations based on wind and solar at Inter-State Level

Published with a draftDated 31 Mar 2015

Published with the draft Renewable Energy Certificate (Fourth Amendment) Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a CERC proposal paper, dated 31 March 2015 and signed by the Chairperson and two Members, setting out a framework for forecasting, scheduling and imbalance handling for inter-state wind and solar generating stations whose scheduling is done by RLDCs (p1, p4, p11). It is not itself a regulation: it presents a proposed methodology and states that amendments to the IEGC Regulations 2010, the DSM Regulations 2014 and the REC Regulations 2010 are proposed as a consequence (p11).

Pages 1–3 set out the problem and reproduce the existing IEGC 2010 provisions — the special dispensation for wind and solar scheduling under Regulation 6.5 and the Renewable Regulatory Charge / Renewable Regulatory Fund mechanism in Annexure-I — and record that implementation was extended to 01.01.2012 by a CERC notification dated 14.01.2011 and that the RRF was suspended by a CERC order dated 7 January 2014 pending a review of the mechanism (p3–4).

Pages 4–9 contain the proposed methodology in four parts: forecasting duties on both the generator and the concerned RLDC, with REMC forecasts available as an option; scheduling of wind and solar like any other generator, paid on scheduled rather than actual generation, with more schedule-revision opportunities; boundary metering through SEMs with weekly readings to the RLDC; and a frequency-delinked deviation settlement built on a proposed ±12% volume band, pre-defined per-kWh charges to the DSM Pool and REC issuance or purchase to balance shortfalls and excesses (p4–9).

Pages 9–10 cover RPO fulfilment, treating scheduled energy as the renewable energy procured and using RECs to settle the difference between schedule and actual, with solar and non-solar RECs kept separate and the REC quantities shown in the RPC's DSM account. Pages 10–11 add data telemetry and technical-standards compliance obligations, and administrative issues: monitoring by the Central Agency, sensitising SERCs through the Forum of Regulators, RLDC verification of metering for ISGS wind/solar generators, and registration of such generators as both buyers and sellers of RECs (p10–11).

Standard name
Grid Code, DSM Regulations, REC Regulations
Primary topics
Scheduling and despatch, Deviation settlement (DSM), Renewable energy certificates (REC)

Read with this

The regulation

Other copies of these documents (4)

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document