Skip to content

CERC · Central Electricity Regulatory Commission

Designation of NLDC as Central Agency under the Renewable Energy Certificate Regulations

Designation of an Agency as a Central Agency

OrderDate not statedPetition No.18/2010 (Suo-motu)

Replaced by Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Renewable Energy Certificate Regulations, 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

On its own motion (Petition No.18/2010), the Commission designates the National Load Despatch Centre as the Central Agency for the Renewable Energy Certificate framework (p1). Paragraph 1 records that the REC Regulations were notified on 14 January 2010 and that Regulation 3(1) requires the Commission to designate a Central Agency only after satisfying itself of that agency's capability (p1). Paragraph 2 states that NLDC — established under section 26(1) of the Electricity Act 2003 and described as the apex national agency responsible for integrated operation of the national power system — has the required capability (p1). Paragraph 3 exercises the Regulation 3(1) power to make the designation, and paragraph 4 directs that a notification of it be published in the Official Gazette (p1). The order prints no date of issue and no gazette date.

Standard name
REC Regulations
Primary topics
Renewable energy certificates (REC)

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (4)

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document