Skip to content

CERC · Central Electricity Regulatory Commission

Renewable Energy Certificate (Fourth Amendment) Regulations, 2015

Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) (Fourth Amendment) Regulations, 2015

Draft amendmentReleased with the notice dated 31 Mar 2015

Draft

A proposal that has since been finalised as the Renewable Energy Certificate Regulations, 2010 — Fourth Amendment, 2016.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A short two-part CERC instrument that makes the fourth amendment to the Commission's Renewable Energy Certificate (REC) Regulations, 2010 (p1–2). Part 1 gives the amendment its title and provides that it takes effect from the date of publication in the Official Gazette (p1). Part 2 is the only substantive change: a new clause (1B) inserted after clause (1A) of Regulation 5 of the Principal Regulations (p1). It creates an additional route to REC issuance for a narrow class of generators — wind and solar energy generators whose scheduling is done by the RLDCs and who are governed by the CERC Deviation Settlement Mechanism Regulations — making them eligible for RECs on the quantum of deviation from schedule that counts as over-injection, as evidenced by the deviation charge accounts prepared by the concerned Regional Power Committee (p1). So the REC entitlement, on this route, is tied to the DSM settlement accounts rather than to scheduled energy.

A Note at the foot of page 1 and continuing on page 2 recites the gazette publication history of the Principal Regulations and of the first, second and third amendments; it records dates only and makes no further change (p1–2).

Standard name
REC Regulations
Primary topics
Renewable energy certificates (REC)

Read with this

The regulation

Other copies of these documents (4)

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document