CERC · Central Electricity Regulatory Commission
Renewable Energy Certificate Regulations, 2010 — Second Amendment, 2013
Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) (Second Amendment) Regulations, 2013
Amendment · Gazette copyDated 10 Jul 2013Published in the Gazette 10 Jul 2013No. L‐1/12/2010‐CERC dated New Delhi, the 10th July, 2013
Replaced by Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022
See that regulation for the date it took effect and for anything it keeps in force.
The Gazette copy of the Renewable Energy Certificate (REC) (Second Amendment) Regulations, 2013.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's Second Amendment to its Renewable Energy Certificate regulations, notified in the Gazette on 10 July 2013 (p1, p4). It rewrites the eligibility, application, trading and validity rules of the 2010 REC framework, whose publication date (18.1.2010) and first amendment (1.10.2010) are recorded in the closing Note (p7). It comes into force on Gazette publication (p4).
Eligibility (p4–6). Regulation 2(1)(k) is deleted. Regulation 5(1)(b) is replaced to bar RECs where the generator has a power purchase agreement for that capacity with an obligated entity at a tariff determined under s.62 or adopted under s.63, with a carve-out treating the distribution licensee's assessed/sanctioned connected load as the captive capacity of RE-based co-generation plants. Regulation 5(1)(c) is reworded around the pooled cost of power purchase as determined by the Appropriate Commission, and its old provisos are replaced by a set covering premature termination of a PPA (a bar of three years or till scheduled expiry, whichever is earlier), captive generating plants that have taken or forgone concessional transmission/wheeling or banking benefits, plants not meeting the Electricity Rules, 2005 CGP conditions, and referral of benefit disputes to the Appropriate Commission. A new sub-clause (d) excludes generation sold to an obligated entity for RPO compliance. 'Banking facility benefit' is defined in an Explanation.
Procedure and trading (p6). Regulation 7 sets a six-month application window from the corresponding generation, with applications on the 10th, 20th and last day of the month, and renames 'captive power producer' as 'captive generating plant'. Regulation 8 requires certificates to be dealt with only through a power exchange unless the Commission orders otherwise, and allows a renewable energy generator, including a CGP, to retain certificates to offset its own RPO as a consumer, subject to State Agency certification and verification, with a bar on offsetting group companies' RPO. Regulation 9 replaces 'preferential tariff' with the s.62/s.63 tariff formulation.
Validity (p6–7). Regulation 10 fixes issuance from the later of commercial operation or registration by the Central Agency, a certificate validity of 730 days, continued validity on later revocation of accreditation, and revocation with recovery plus interest at 2% over the SBI Base rate where accreditation was obtained on false or suppressed information.
Read with this
The regulation
- Dated 14 Jan 2010Renewable Energy Certificate Regulations, 2010
Amendments and corrections
- Dated 29 Sep 2010REC (First Amendment) Regulations, 2010
- Dated 10 Jul 2013Renewable Energy Certificate (REC) (Second Amendment) Regulations, 2013
- Dated 30 Dec 2014Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — Third Amendment, 2014
- Dated 27 Jan 2015Corrigendum to the Notification dated 30 December 2014 on Solar RECs, January 2015
- Dated 23 Mar 2016Renewable Energy Certificate Regulations, 2010 — Fourth Amendment, 2016
- Dated 28 Mar 2016Renewable Energy Certificate Regulations, 2010 — Fourth Amendment, 2016
Commencement notices and reasons
- Dated 14 Jan 2010Renewable Energy Certificate Regulations, 2010 — Statement of Objects and Reasons
- Dated 27 Sep 2010Renewable Energy Certificate Regulations, 2010 — First Amendment — Statement of Objects and Reasons
- Dated 10 Jul 2013Renewable Energy Certificate (Second Amendment) Regulations, 2013 — Statement of Reasons
- Dated 30 Dec 2014Renewable Energy Certificate (Third Amendment) Regulations, 2014 — Statement of Reasons
- Dated 28 Mar 2016Renewable Energy Certificate Fourth Amendment Regulations, 2015 — Statement of Reasons
Procedures and orders made under it
- Dated 30 Dec 2014Determination of Forbearance and Floor Price for the Solar REC, 2014
- Date not statedDesignation of NLDC as Central Agency under the Renewable Energy Certificate Regulations
- Date not statedREC Procedures
Other copies of these documents (3)
- Dated 14 Jan 2010Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — as amended
- Dated 29 Sep 2010Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — First Amendment, 2010
- Dated 30 Dec 2014Renewable Energy Certificate Regulations, 2010 — Third Amendment, 2014
Proposed changes (drafts with no final yet)
- Dated 26 Jun 2015Renewable Energy Certificate for Renewable Energy Generation (Fifth Amendment) Regulations, 2015 — Draft
- Dated 26 Jun 2015Public notice: Public Notice on Draft Renewable Energy Certificate (Fifth Amendment) Regulations, 2015
- Released with the notice dated 26 Jun 2015Explanatory memorandum: Renewable Energy Certificate (Fifth Amendment) Regulations, 2015 — Explanatory Memorandum — Draft
Earlier drafts
- Dated 2 Apr 2013Renewable Energy Certificate (Second Amendment) Regulations, 2013 — Draft
- Released with the notice dated 2 Apr 2013Explanatory memorandum: REC (Second Amendment) Regulations, 2012 — Explanatory Memorandum — Draft
- Dated 2 Apr 2013Public notice: REC (Second Amendment) Regulations, 2013 — Draft — Public Notice
- Dated 30 Sep 2014Renewable Energy Certificate for Renewable Energy Generation (Third Amendment) Regulations, 2014 — Draft
- Released with the notice dated 30 Sep 2014Explanatory memorandum: REC Third Amendment Regulations, 2014 — Explanatory Memorandum — Draft
- Dated 30 Sep 2014File: Solar REC Floor and Forbearance Price Order, 2014
- Dated 30 Sep 2014Public notice: Draft REC (Third Amendment) Regulations, 2014 and Solar REC Forbearance and Floor Price Order — Public Notice
- Released with the notice dated 31 Mar 2015Renewable Energy Certificate (Fourth Amendment) Regulations, 2015
- Dated 31 Mar 2015File: Proposed Framework for Forecasting, Scheduling & Imbalance Handling for Wind and Solar RE at Inter-State Level — Draft
- Dated 31 Mar 2015Public notice: Proposed Framework for Forecasting, Scheduling & Imbalance Handling for Wind and Solar RE Generating Stations at Inter-State Level — Public Notice, 2015
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.