Skip to content

CERC · Central Electricity Regulatory Commission

Determination of Forbearance and Floor Price for the Solar REC, 2014

Determination of Forbearance and Floor Price for the Solar REC

OrderDated 30 Dec 2014Petition No. SM/016/2014 (Suo Motu) dated 30th December, 2014

Replaced by Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Renewable Energy Certificate Regulations, 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a suo motu CERC order in Petition No. SM/016/2014 dated 30 December 2014. It reviews the price band for solar Renewable Energy Certificates (RECs) under the REC Regulations and decides new floor and forbearance prices for solar RECs after public consultation (p1, p3–5). The order recaps the REC framework — one REC per MWh injected, with floor and forbearance prices to limit volatility — and the guiding principles in Regulation 9 of the REC Regulations (p1–2). It records earlier CERC price orders of 1 June 2010 and 13 June 2011 and notes that the solar price band then in force was Rs 9,300–13,400 per REC for 2012–17 (p2). Because solar PV tariffs had fallen, the Commission proposed lower solar REC prices and vintage multipliers for older projects (p3–4).

After 87 written comments and a public hearing on 10 November 2014, the Commission analyses objections (p5–16). On prices, it retains its proposal and says the new solar REC floor and forbearance prices will apply from the date of notification of this order and remain valid for the control period up to FY 2016-17 (p6–8). It rejects the request to defer the cut-off to 31 March 2015 (p7). On vintage multipliers, it adopts the formula inserted by the Third REC Amendment Regulations — floor price of base year divided by current year floor price — for solar projects registered before those regulations, and provides that the vintage-multiplier dispensation runs only up to 31 March 2017 (p11–12). The order keeps separate vintage multipliers for open access sales and for captive/self-consumption solar projects in abeyance (p12–15) and directs staff to bring a fresh proposal on CGP eligibility (p15). Suggestions on RPO enforcement, quarterly compliance, REC shelf life and related matters are held outside the present exercise (p15–16). Annexure-1 lists written commenters and Annexure-2 lists public-hearing participants (p17–20).

Standard name
REC Regulations
Primary topics
Renewable energy certificates (REC)

Read with this

The regulation

Procedures and orders made under it

Other copies of these documents (4)

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document