CERC · Central Electricity Regulatory Commission
Determination of Forbearance and Floor Price for the Solar REC, 2014
Determination of Forbearance and Floor Price for the Solar REC
OrderDated 30 Dec 2014Petition No. SM/016/2014 (Suo Motu) dated 30th December, 2014
Replaced by Renewable Energy Certificates for Renewable Energy Generation Regulations, 2022
See that regulation for the date it took effect and for anything it keeps in force.
Made under the Renewable Energy Certificate Regulations, 2010.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a suo motu CERC order in Petition No. SM/016/2014 dated 30 December 2014. It reviews the price band for solar Renewable Energy Certificates (RECs) under the REC Regulations and decides new floor and forbearance prices for solar RECs after public consultation (p1, p3–5). The order recaps the REC framework — one REC per MWh injected, with floor and forbearance prices to limit volatility — and the guiding principles in Regulation 9 of the REC Regulations (p1–2). It records earlier CERC price orders of 1 June 2010 and 13 June 2011 and notes that the solar price band then in force was Rs 9,300–13,400 per REC for 2012–17 (p2). Because solar PV tariffs had fallen, the Commission proposed lower solar REC prices and vintage multipliers for older projects (p3–4).
After 87 written comments and a public hearing on 10 November 2014, the Commission analyses objections (p5–16). On prices, it retains its proposal and says the new solar REC floor and forbearance prices will apply from the date of notification of this order and remain valid for the control period up to FY 2016-17 (p6–8). It rejects the request to defer the cut-off to 31 March 2015 (p7). On vintage multipliers, it adopts the formula inserted by the Third REC Amendment Regulations — floor price of base year divided by current year floor price — for solar projects registered before those regulations, and provides that the vintage-multiplier dispensation runs only up to 31 March 2017 (p11–12). The order keeps separate vintage multipliers for open access sales and for captive/self-consumption solar projects in abeyance (p12–15) and directs staff to bring a fresh proposal on CGP eligibility (p15). Suggestions on RPO enforcement, quarterly compliance, REC shelf life and related matters are held outside the present exercise (p15–16). Annexure-1 lists written commenters and Annexure-2 lists public-hearing participants (p17–20).
Read with this
The regulation
- Dated 14 Jan 2010Renewable Energy Certificate Regulations, 2010
Amendments and corrections
- Dated 29 Sep 2010REC (First Amendment) Regulations, 2010
- Dated 10 Jul 2013Renewable Energy Certificate (REC) (Second Amendment) Regulations, 2013
- Dated 30 Dec 2014Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — Third Amendment, 2014
- Dated 27 Jan 2015Corrigendum to the Notification dated 30 December 2014 on Solar RECs, January 2015
- Dated 23 Mar 2016Renewable Energy Certificate Regulations, 2010 — Fourth Amendment, 2016
- Dated 28 Mar 2016Renewable Energy Certificate Regulations, 2010 — Fourth Amendment, 2016
Commencement notices and reasons
- Dated 14 Jan 2010Renewable Energy Certificate Regulations, 2010 — Statement of Objects and Reasons
- Dated 27 Sep 2010Renewable Energy Certificate Regulations, 2010 — First Amendment — Statement of Objects and Reasons
- Dated 10 Jul 2013Renewable Energy Certificate (Second Amendment) Regulations, 2013 — Statement of Reasons
- Dated 30 Dec 2014Renewable Energy Certificate (Third Amendment) Regulations, 2014 — Statement of Reasons
- Dated 28 Mar 2016Renewable Energy Certificate Fourth Amendment Regulations, 2015 — Statement of Reasons
Procedures and orders made under it
- Date not statedDesignation of NLDC as Central Agency under the Renewable Energy Certificate Regulations
- Date not statedREC Procedures
Other copies of these documents (4)
- Dated 14 Jan 2010Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — as amended
- Dated 29 Sep 2010Renewable Energy Certificate for Renewable Energy Generation Regulations, 2010 — First Amendment, 2010
- Dated 10 Jul 2013Renewable Energy Certificate Regulations, 2010 — Second Amendment, 2013
- Dated 30 Dec 2014Renewable Energy Certificate Regulations, 2010 — Third Amendment, 2014
Proposed changes (drafts with no final yet)
- Dated 26 Jun 2015Renewable Energy Certificate for Renewable Energy Generation (Fifth Amendment) Regulations, 2015 — Draft
- Dated 26 Jun 2015Public notice: Public Notice on Draft Renewable Energy Certificate (Fifth Amendment) Regulations, 2015
- Released with the notice dated 26 Jun 2015Explanatory memorandum: Renewable Energy Certificate (Fifth Amendment) Regulations, 2015 — Explanatory Memorandum — Draft
Earlier drafts
- Dated 2 Apr 2013Renewable Energy Certificate (Second Amendment) Regulations, 2013 — Draft
- Released with the notice dated 2 Apr 2013Explanatory memorandum: REC (Second Amendment) Regulations, 2012 — Explanatory Memorandum — Draft
- Dated 2 Apr 2013Public notice: REC (Second Amendment) Regulations, 2013 — Draft — Public Notice
- Dated 30 Sep 2014Renewable Energy Certificate for Renewable Energy Generation (Third Amendment) Regulations, 2014 — Draft
- Released with the notice dated 30 Sep 2014Explanatory memorandum: REC Third Amendment Regulations, 2014 — Explanatory Memorandum — Draft
- Dated 30 Sep 2014File: Solar REC Floor and Forbearance Price Order, 2014
- Dated 30 Sep 2014Public notice: Draft REC (Third Amendment) Regulations, 2014 and Solar REC Forbearance and Floor Price Order — Public Notice
- Released with the notice dated 31 Mar 2015Renewable Energy Certificate (Fourth Amendment) Regulations, 2015
- Dated 31 Mar 2015File: Proposed Framework for Forecasting, Scheduling & Imbalance Handling for Wind and Solar RE at Inter-State Level — Draft
- Dated 31 Mar 2015Public notice: Proposed Framework for Forecasting, Scheduling & Imbalance Handling for Wind and Solar RE Generating Stations at Inter-State Level — Public Notice, 2015
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.