Skip to content

CERC · Central Electricity Regulatory Commission

Renewable Energy Certificate (Second Amendment) Regulations, 2013 — Draft

Central Electricity Regulatory Commission (Terms and Conditions for recognition and issuance of Renewable Energy Certificate for Renewable Energy Generation) (Second Amendment) Regulations, 2013

Draft amendmentDated 2 Apr 2013No.L‐1/12/2010‐CERC dated 2nd April, 2013

Draft

A proposal that has since been finalised as the Renewable Energy Certificate (REC) (Second Amendment) Regulations, 2013.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission issued this draft notification on 2 April 2013 to amend its 2010 regulations on recognition and issuance of Renewable Energy Certificates — the second amendment to that framework (p1). It is a clause-by-clause amending instrument: each numbered paragraph replaces, deletes or adds a provision of the principal regulations, and it comes into force from the date of publication in the Official Gazette (p1). The Gazette date is not printed.

Page 1 deletes a definition in Regulation 2. Pages 2–4 rewrite the eligibility conditions in Regulation 5: the power-purchase-agreement test for eligibility, a rule for bagasse-based co-generation treating the sanctioned connected load as captive capacity, a substitute test for the price at which a distribution licensee's own power purchases are pooled, and a new bar on selling to an obligated entity for RPO compliance. New provisos govern captive generating plants (CGPs) and concessional transmission/wheeling or banking benefits — including a cooling-off period after an entity voluntarily forgoes such benefits, and referral of disputes to the Appropriate Commission — with an Explanation defining 'banking facility benefit' (p3).

Page 4 amends Regulation 7 (application window and monthly filing dates; terminology changed from 'captive power producer' to 'captive generating plant') and Regulation 8 (certificates to be dealt only through power exchanges; CGPs may retain certificates to offset their own renewable purchase obligation). Page 5 amends Regulation 10, restating when a plant becomes eligible for certificates and the validity period of an issued certificate, with a saving for certificates already issued even if accreditation is later revoked. A closing Note records the gazette publication details of the principal regulations and the first amendment.

Standard name
REC Regulations
Primary topics
Renewable energy certificates (REC), Captive status, Renewable purchase obligation (RPO / RCO)

Read with this

The regulation

Other copies of these documents (4)

Proposed changes (drafts with no final yet)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document