Skip to content

CERC · Central Electricity Regulatory Commission

Deviation Settlement Mechanism and related matters Regulations, 2014 — Fourth Amendment, 2018 — Explanatory Memorandum

Explanatory Memorandum

Explanatory memorandum to a draftReleased with the notice dated 29 Jun 2018

Explanatory memorandum to the Deviation Settlement Mechanism and related matters, 2014 — Fourth Amendment, 2018 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is the Explanatory Memorandum accompanying the CERC (Deviation Settlement Mechanism and related matters) (Fourth Amendment) Regulations, 2018. It explains why CERC decided to revise the deviation settlement mechanism (DSM) and records the Commission's approval of an Expert Group's recommendations and its decision to initiate amendments to the 2014 DSM Regulations (p1, p12).

Pages 1–3 set out the existing DSM framework: its objective of grid discipline and grid security through commercial settlement of drawal/injection deviations, the operational frequency band and charge structure, volume limits, cap rates, prohibitions on continuous over/under-drawal, the sign-reversal rule and certain exemptions. Pages 3–5 describe the Expert Group constituted by CERC Office Order dated 27.04.2017 and its two report volumes, and compare deviation prices with bilateral, power exchange, DSM and ancillary services prices (pp1–5).

Pages 6–8 analyse critical issues in the present DSM: regulatory lag in revising administered rates, linkage to variable cost rather than value of lost load, muted price signals, failure to reflect peak/off-peak value or transmission congestion, limited iterations of collective markets and absence of gate closure (pp6–8). Pages 8–11 summarise the Expert Group's proposed measures: linking the DSM price vector to day-ahead market prices and area clearing price, a dynamic slope based on daily average ACP, a revised reference frequency band, continued renewable-energy methodology, retained volume limits, cap-rate reform, stricter sign-reversal and daily deviation limits, and supporting market/reserve reforms (pp8–11).

Pages 12–13 record CERC's consideration and approval of the recommendations and list the salient features of the proposed Fourth Amendment: a market-linked DSM price vector, revised reference frequency band, dynamic slope, a ceiling on daily average ACP, selection of the reference power exchange by market share, cap rates linked to previous month's energy charges, fewer time blocks for sign change, an additional surcharge for violations, and daily deviation limits with penalties (pp12–13).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM)

Read with this

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document