Skip to content

CERC · Central Electricity Regulatory Commission

Deviation Settlement Mechanism and related matters (Second Amendment) Regulations, 2015 — Draft

Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) (Second Amendment) Regulations, 2015

Draft amendmentReleased with the notice dated 31 Mar 2015

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Central Electricity Regulatory Commission regulation amending the Deviation Settlement Mechanism (DSM) framework so that wind and solar generators whose scheduling is done by the Regional Load Despatch Centres sit under a separate settlement regime from other sellers (p1–2). It is the second amendment to the 2014 Principal Regulations; the Note records the Principal Regulations, their corrigendum and the first amendment (p2–3).

Clauses 2, 3 and 5 carve these generators out of the general deviation-charge machinery of Regulation 5: the ordinary over-injection pricing formula, the zero-charge treatment of over-injection beyond a set share of schedule, and the Commission's methodology clause are all confined to sellers other than RLDC-scheduled wind and solar (p1–2).

Clause 4 inserts new sub-clauses (v) to (vii) into Regulation 5(1), creating a banded regime keyed to percentages of schedule. Shortfall in the upper band attracts payment to the Regional DSM Pool at a fixed rate plus purchase and transfer of Renewable Energy Certificates equivalent to the shortfall energy; deeper shortfall attracts the same at a rate for the energy below that band, with the certificates to be extinguished under the REC Regulations. Excess generation in the lower band earns a DSM Pool payment plus issuance of certificates, while generation beyond the upper band is compensated by certificates alone (p1–2).

Clause 6 inserts a proviso to Regulation 7(1) disapplying the deviation-volume limits and their consequences to the same class of generators (p2). All fixed rates are left to separate Commission orders, so the amendment establishes structure rather than numbers (p2).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Renewable energy certificates (REC)

Read with this

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document