Deviation Settlement Mechanism and related matters Regulations, 2014 — Fifth Amendment, 2019

Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) (Fifth Amendment) Regulations, 2019

AmendmentDated 28 May 2019In force from 3 Jun 2019No. L-1/132/2013-CERC dated 28th May, 2019

Replaced by Deviation Settlement Mechanism and Related Matters Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Deviation Settlement Mechanism and related matters Regulations, 2014.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Fifth Amendment to CERC's Deviation Settlement Mechanism (DSM) Regulations, 2014, notified on 28 May 2019 and brought into force from 3 June 2019 (p1). It reworks both the price of grid deviation and the consequences of sustained deviation.

It first adds two definitions to Regulation 2 — Daily Base DSM Charge and Time Block DSM Charge, both expressly excluding additional charges under Regulation 7 (p1). Regulation 5 then changes how deviation charges are computed: inter-regional deviations and deviations in cross-border transactions move to an unconstrained Day Ahead Market clearing price basis, entities spread across several bid areas are charged on the daily average area clearing price of their largest-demand bid area, and the cap on deviation charges for generating stations is fixed at 303.04 Paise/kWh regardless of fuel type and regardless of whether the station's tariff is regulated by the Commission — replacing the earlier link to energy charges as billed (p2).

Regulation 7 carries most of the change (p2–5): a proviso is deleted, every remaining reference to an energy-charge-linked cap rate in Table-II, the proviso to clause (6) and Annexure-I is replaced by the fixed cap rate, clause (4) is substituted to impose an additional charge on over-injection/under-drawal when frequency sits in the upper band, and clause (10) is substituted with a two-phase sign-change obligation — a longer correction window until 31 March 2020 and a tighter one from 1 April 2020 — backed by per-violation additional charges, a daily reset of the violation count, and a list of exemptions. Worked illustrations show how violations are counted (p5). Clause (11) is replaced so that DSM charges and additional charges apply without prejudice to Commission action under section 142, and clause (11)(a) is deleted (p5–6). Annexure-I's cap-rate wording is harmonised (p6), and a closing Note records the gazette publication of the 2014 Principal Regulations and its corrigendum and four prior amendments (p6).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM)

Read with this

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.