Skip to content

CERC · Central Electricity Regulatory Commission

Explanatory Memorandum to Draft Deviation Settlement Mechanism Regulations, 2013

EXPLANATORY MEMORANDUM to Draft 'Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2013'

Explanatory memorandum to a draftReleased with the notice dated 20 Jun 2013

Draft

The draft has since been finalised as the Deviation Settlement Mechanism and related matters Regulations, 2014.

Explanatory memorandum to the Deviation Settlement Mechanism and related matters Regulations, 2013 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

Explanatory memorandum from CERC staff to the draft DSM Regulations 2013. Pages 1–2 set out the background: the second amendment to the UI Regulations 2009, its stay and eventual effect, the July 2012 grid failures, the CEA-chaired Enquiry Committee's recommendation to phase out frequency control through UI, and NLDC's petition which CERC treated as a proposal. Pages 2–5 argue for narrowing the grid frequency band and for strict volume limits on UI injection/withdrawal, with the aim of making UI a grid-discipline mechanism rather than a market; they cite capacity additions and grid-frequency data. Pages 5–9 propose the new DSM architecture: volume caps on over-drawal/under-drawal and under-injection/over-injection, additional charges scaled to the breach, zero charges for excess under-drawal/over-injection, exemptions for infirm-power injection and start-up drawal before COD, deletion of the UI Regulation provisions on gaming and unlimited hydro flexibility, and a requirement to change the sign of deviation every six time blocks. Pages 10–12 discuss linking deviation charges to power exchange area clearing prices and introducing locational bias; the memorandum decides to continue with an energy-charge-based price vector, proposes revised deviation price vectors and cap rates, sets infirm-power cap rates, and proposes an under-injection safeguard linked to the generator's previous-month energy charge. Page 12 states that the UI Regulations 2009 are to be repealed and that other provisions are carried into the new regulation, except Regulation 11 on the UI Pool Account Fund, to be handled under the Power System Development Funds regulations. Appendices pp14–24 supply frequency profiles, UI plots, short-term transaction data, NTPC/NLC variable charges, and Annexure-II/III computation methodologies for additional deviation charges.

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Grid operation and grid code

Read with this

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document