Deviation Settlement Mechanism and related matters (Second Amendment) Regulations, 2015

Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) (Second Amendment) Regulations, 2015

AmendmentDated 7 Aug 2015In force from 1 Nov 2015No. 1/14/2015-Reg.Aff.(FSDS)(ii)/CERC dated 7 th August, 2015

Replaced by Deviation Settlement Mechanism and Related Matters Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Deviation Settlement Mechanism and related matters Regulations, 2014.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the second amendment to the CERC (Deviation Settlement Mechanism and related matters) Regulations, 2014. It was notified on 7 August 2015 but brings itself into force only from 1 November 2015 (p1). Its single purpose is to carve wind and solar generators that are regional entities out of the general DSM regime and give them a separate deviation-settlement treatment.

Clause 2 inserts two definitions into Regulation 2 of the principal regulations: "Absolute Error", the absolute value of the error between actual and scheduled generation of wind/solar regional entities, expressed as a percentage of Available Capacity and computed for each 15-minute time block; and "Available Capacity (AvC)", the cumulative capacity rating of wind turbines or solar inverters capable of generating in a given time-block (p1).

Clauses 3 to 6 rework Regulation 5. The general over-injection charge under Regulation 5(1) and the Regulation 5(2) price methodology are stated to apply to all sellers except wind and solar regional entities (p1–2), and the zero-charge treatment of over-injection beyond the volume limit is restated with the same carve-out, infirm power being dealt with separately (p2). New sub-clauses (v) to (vii) then set out the dedicated regime: one table of deviation charges payable by such generators to the Regional DSM Pool for under-injection, and another of charges payable to them from the Pool for over-injection, both graded by absolute-error bands. The rate is fixed at the PPA rate determined under section 62 or adopted under section 63, taken as a weighted average where there are multiple PPAs, and at national-level APPC for open-access sellers whose output is not counted toward the buyer's RPO and for captive wind or solar plants; generators must file their PPA rates on affidavit with the respective RPC (p2–4). Sub-clause (vii) requires NLDC to net deviations for the whole pool monthly and to balance any residual RPO shortfall through purchase of equivalent solar and non-solar RECs from the Pool Account, with notional RECs credited to the Pool and carried forward where the balance is positive (p4).

Clause 7 adds a proviso to Regulation 7(1) so that the limits on deviation volume and their consequences, including additional deviation charges, do not apply to these generators (p4). A closing Note records the publication history of the principal regulations, the corrigendum and the first amendment (p4).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC)

Read with this

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document