CERC · Central Electricity Regulatory Commission

Deviation Settlement Mechanism and related matters Regulations, 2013 — Draft

Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2013

Draft regulationDated 20 Jun 2013No.L-1/132/2013/CERC.- dated 20th of June 2013

Draft

A proposal that has since been finalised as the Deviation Settlement Mechanism and related matters Regulations, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

These are the Central Electricity Regulatory Commission's draft Deviation Settlement Mechanism (DSM) Regulations, 2013 — a draft notification dated 20 June 2013, made under Section 178 of the Electricity Act 2003 after previous publication, to replace the Unscheduled Interchange regime. They apply to generating stations whose tariff the Commission determines, their beneficiaries, and sellers and buyers transacting through short-, medium- or long-term open access in inter-State transmission (p4). The stated objective is grid security and grid discipline enforced through a commercial mechanism (p4).

Regulation 5 is the core: it specifies a frequency-linked price vector for Charges for Deviation, moving in 0.01 Hz steps, with zero charge at or above a threshold frequency, higher steps below it, and cap rates for coal/lignite/APM-gas stations and for under-drawal/over-injection. It also sets out the methodology for deriving the vector from the average energy charges of coal/lignite stations over a six-month reference window, and ceiling rates for infirm power injected during pre-COD testing (p4–7).

Regulations 6–7 deal with declaration and scheduling under the Grid Code and Open Access Regulations, treat intentional mis-declaration as 'gaming' (proceedings may be initiated suo motu or on petition, with disallowance of deviation charges), cap deviation volume per time block and per day, and set slab-wise Additional Charges for Deviation beyond those limits. Several additional-charge rates are left to be specified later by the Commission (p8–13). Regulation 7 also obliges each regional entity to reverse the sign of its deviation at least once every six time blocks.

Regulations 8–11 cover settlement machinery: binding RLDC instructions, weekly RPC deviation statements, the Regional Deviation Pool Account Fund and its appropriation waterfall, monthly publication of deviation accounts, payment deadlines with default interest, Letter of Credit security, and transfer of residual balances to the Power Systems Development Fund. Regulations 12–14 give the Commission power to relax and to issue directions, and repeal the 2009 UI Regulations with savings (p14–18). Annexures I and II give the computation methodology for under-drawal/over-injection and over-drawal/under-injection respectively (p19–20).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Energy accounting and settlement, Scheduling and despatch

Read with this

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document