Deviation Settlement Mechanism and related matters (First Amendment) Regulations, 2014

Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) (First Amendment) Regulations, 2014

AmendmentDated 18 Dec 2014No:L-1/132/2013/CERC dated 18 th December, 2014

Replaced by Deviation Settlement Mechanism and Related Matters Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Deviation Settlement Mechanism and related matters Regulations, 2014.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

Two-page CERC notification dated 18 December 2014, issued under s.178 of the Electricity Act, 2003, amending the CERC (Deviation Settlement Mechanism and related matters) Regulations, 2014 ("the Principal Regulations"). Nothing here is a standalone regime: every operative paragraph rewrites a specific provision of the Principal Regulations.

Paragraph 1 gives the short title and provides commencement from the date of publication in the Official Gazette (p1) — the Gazette date is not printed in the text. Paragraph 3 rewrites Regulation 5 so that the APM-gas-linked rate is no longer tied to a fixed calendar date but to the date on which the Government of India revises the APM gas price, with the rate after that revision to be notified by the Commission separately (p1).

Paragraph 4 substitutes Regulation 7(1) and 7(2): it restates the volume limits on overdrawal/underdrawal by buyers and under-injection/over-injection by sellers, the frequency band in which those limits operate, and the bar on overdrawal below and underdrawal above that band; it also carries exemptions for infirm injection before commercial operation during testing and commissioning, and for start-up drawal by a generating station before COD (p1–2).

Paragraph 5 corrects Annexure-II of the Principal Regulations, changing "Payable" to "Receivable" in Para A and replacing the notation "D 12/150" with "Dtb" in Para C (p2). A closing Note records the publication history of the Principal Regulations and their earlier corrigendum (p2).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Fuel price and supply

Read with this

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document