Skip to content

CERC · Central Electricity Regulatory Commission

Deviation Settlement Mechanism and Related Matters, Third Amendment Regulations, 2015 — Draft

Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) (Third Amendment) Regulations, 2015

Draft amendmentDated 23 Oct 2015No.–L-1/(3)/2009-CERC dated 23rd October 2015

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft CERC notification dated 23 October 2015 (p1) proposing the Third Amendment to the Commission's Deviation Settlement Mechanism regulations. It is made under section 178 of the Electricity Act, 2003 and would come into force on publication in the Official Gazette (p1); no Gazette date is printed.

Chapter 1 (p1) gives the short title and commencement. Regulation 2 (p1) adds a proviso attributing a Regional Entity's deviation to the entities embedded within a State, and defines 'Peak Demand' by reference to the CEA's published 2014-15 peak availability, carried in Annexure-III.

Regulation 3 (p1-2) replaces the fixed over-injection deviation volume limits in Regulation 5 with the state-wise limit 'L' set out in Annexure-III, and rewrites the zero-charge rule for over-injection, with a 400 MW reference-schedule proviso and a carve-out for wind and solar regional entities.

Regulation 4 (p2-4) reworks Regulation 7: same swap of fixed limits for Annexure-III limits on the drawal/injection side, deletion of the existing proviso exempting wind and solar regional entities, restated frequency-linked volume limits, substitution of Table I (buyers/sellers) and Table I-G (generating stations) with graded additional charges, and extension of the 400 MW reference basis to those tables.

Regulations 5 and 6 (p4) retitle Annexure-I and Annexure-II and add new Annexure-I-A and Annexure-II-A. The annexure text (p5-7) gives the computation methodology: normal deviation charges within the limits, and graded additional charges once the limits are crossed, including a specified rate when grid frequency falls below 49.7 Hz. Annexure-III (p8) tabulates state/UT peak demand met against the deviation limit 'L', with a residual formula for entities not listed.

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM)

Read with this

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document