Skip to content

CERC · Central Electricity Regulatory Commission

Public notice for public hearing on draft Deviation Settlement Mechanism (Fifth Amendment) Regulations, 2019

Draft Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) (Fifth Amendment) Regulations, 2019

Hearing notice on a draftDated 3 May 2019No. RA-14026(14)/1/2019-CERC dated 03.05.2019

Hearing notice on the Deviation Settlement Mechanism and related matters, 2014 — Fifth Amendment Regulations, 2019 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page public notice from the Central Electricity Regulatory Commission announcing an oral public hearing on the draft CERC (Deviation Settlement Mechanism and related matters) (Fifth Amendment) Regulations, 2019 (p1). It records that the draft regulations were placed on the Commission's website on 18.4.2019 for comments, objections and suggestions, and that a hearing will be held on 22.05.2019 at 10.30 am (p1). The notice sets out the categories of participants invited — Central and State Governments, Load Despatch Centres, State Utilities, CPSUs, CTUs, STUs, transmission and trading licensees, power exchanges, individual experts, NGOs and IPPs — and asks organisations to nominate a responsible officer fully conversant with the subject (p1). Names of proposed participants are to reach the Secretary by 20.05.2019, together with an indication of whether a presentation will be made, which should run 5–10 minutes over 8–10 slides (p1). It is purely a consultation and scheduling instrument: it neither states nor amends any regulatory provision (p1).

Standard name
DSM Regulations

Read with this

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document