Skip to content

CERC · Central Electricity Regulatory Commission

Deviation Settlement Mechanism and Related Matters Regulations — Fifth Amendment, 2019 — Statement of Reasons

In the matter of Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) (Fifth Amendment) Regulations, 2019.

Statement of reasonsDated 12 Jun 2019File No. L-1/132/2013-CERC dated 12 June, 2019

Replaced by Deviation Settlement Mechanism and Related Matters Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Deviation Settlement Mechanism and related matters Regulations, 2014 or one of its amendments.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Statement of Reasons the Central Electricity Regulatory Commission published with the Fifth Amendment to its Deviation Settlement Mechanism (DSM) Regulations. It records the consultation on the draft amendment notified on 18.4.2019, summarises what stakeholders said, and gives the Commission's reasoning for the changes it finally made; the operative amendment text itself is not reproduced here (p1–2).

Issue-1 deals with removal of the daily deviation volume limit in the third proviso to Clause 1 of Regulation 7. The Commission confirms that the daily-deviation discipline introduced by the DSM Fourth Amendment was always intended to be activated later, after reviewing implementation experience, and that volume limits will be considered again at a future date (p2).

Issue-2, the bulk of the document (p2–8), works through the sign change (zero crossing) norm under Clause 10 of Regulation 7: whether it should be linked to frequency, the size of the tolerance band, SCADA–SEM metering mismatch, exemption requests from large hydro, nuclear, waste-heat-recovery, biomass, captive and STOA entities, and interactions with RGMO/FGMO instructions and RRAS/SCED. The outcome is a wider tolerance band (from the proposed ±10 MW to ±20 MW), retention of the existing exemption list without expansion, and differential norms from 1.4.2020.

Issue-3 confirms a single, uniform cap rate for all entities, indexed to the existing 303.04 Paise/kWh reference, and declines separate rates for infirm solar/wind injection or biomass (p8). Issue-4 rejects making the amendment retrospective to 1.1.2019 because weekly settlement accounts are closed and residual funds already transferred to the Power System Development Fund (p8–9).

Two appendices list the 58 organisations and individuals who commented in writing, and those who made oral submissions or presentations (p10–12).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Metering

Read with this

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document