Skip to content

CERC · Central Electricity Regulatory Commission

Deviation Settlement Mechanism (First Amendment) Regulations, 2014 — Explanatory Memorandum — Draft

EXPLANATORY MEMORANDUM to Draft Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) (First Amendment) Regulations, 2014

Explanatory memorandum to a draftReleased with the notice dated 23 Jun 2014

Explanatory memorandum to the Deviation Settlement Mechanism and Related Matters (First Amendment) Regulations, 2014 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is the Central Electricity Regulatory Commission's explanatory memorandum to the draft First Amendment to the CERC (Deviation Settlement Mechanism and related matters) Regulations, 2014. It opens by recording that the Principal Regulations were notified on 6.1.2014 and that a corrigendum was notified on 17.2.2014 (p1). The memorandum then explains the proposed changes clause by clause.

The first proposed change concerns Regulation 5. The memorandum notes that Regulation 5(1)(ii) assumed a cap rate change with effect from 1.4.2014 for CERC-regulated generating stations using APM gas, and that the price of APM gas has not been revised by the Government of India from that date. It proposes to replace the fixed date '1.4.2014' in Regulation 5(1)(ii) with the date of revision of APM gas by the Government of India, and to replace the fixed post-revision rate in Regulation 5(5) for infirm power with 'the rate to be notified by the Commission separately' (p1).

The second proposed change concerns Regulation 7. The memorandum reproduces the existing volume limits on over-drawal/under-drawal by buyers and under-injection/over-injection by sellers, including the frequency conditions and provisos (p1). It then sets out the additional charges for deviation under Regulation 7(4) and 7(6), which apply at high and low frequency extremes, and concludes that the separate volume limits in the provisos to Regulation 7(1) and Regulation 7(2)(i) are unnecessary and should be deleted (p2).

Finally, it proposes a consequential correction to Annexure-II, para c, to align the illustration with Regulation 7(4) (p2). The memorandum is explanatory only; it does not contain the draft amendment regulations or a notification date.

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM)

Read with this

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document