CERC · Central Electricity Regulatory Commission

Forecasting, Scheduling and Imbalance Handling for Wind and Solar, 2015 — Statement of Reasons

Framework on Forecasting, Scheduling and Imbalance Handling for Variable Renewable Energy Sources (Wind and Solar):

Statement of reasonsDate not stated

Replaced by Deviation Settlement Mechanism and Related Matters Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Deviation Settlement Mechanism and related matters Regulations, 2014 or one of its amendments.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 39 of 77. Check the regulator's original before you rely on it.

This is CERC's Statement of Reasons for the framework on forecasting, scheduling and imbalance handling for wind and solar generators that are regional entities. It records the consultation on the draft framework issued on 31.03.2015, the written comments from 41 stakeholders, the 12.06.2015 public hearing, and the Commission's responses, and it explains the amendments to the Indian Electricity Grid Code (IEGC) and the Deviation Settlement Mechanism (DSM) Regulations (p1).

Section 2 deals with applicability. The Commission rejects a narrow reading based on who is scheduled by RLDCs and replaces it with 'wind and solar generators which are regional entities', covering PPA, open access and captive sales; projects connected only to the state transmission network but supplying outside the state remain under SLDC control and state DSM unless separately decided (p2–5).

Section 3 explains the Commission's approach to empirical data and trial rollout: a preparatory window, direction to NLDC to develop the detailed procedure, and no impact on existing PPAs or interconnection agreements (p5–8). Section 4 sets the forecasting framework: both RLDC and generator forecast, generator choice of forecast for scheduling, commercial responsibility on the generator, and recognition of the pooling station or Principal Generator as the operational/commercial building block (p8–17).

Section 5 covers schedule revisions and retains a set number of revisions per day effective from a stated time block (p18–21). Section 6 changes the forecasting-error definition to a percentage of available capacity and provides for absolute error and mean absolute error (p21–23). Section 7 replaces the proposed tolerance band with a no-impact tolerance and a graded deviation-charge design based on absolute error as a percentage of available capacity, with charges expressed as percentages of PPA rate (p24–38). Section 8 begins the commercial and deviation-settlement design, linking shortfalls and excess generation to the Regional DSM Pool and RECs/RPO obligations.

Standard name
Grid Code, DSM Regulations
Primary topics
Scheduling and despatch, Deviation settlement (DSM), Grid operation and grid code

Read with this

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.