Skip to content

CERC · Central Electricity Regulatory Commission

Deviation Settlement Mechanism and Related Matters Regulations, 2014

Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2014

Regulation · Gazette copyDated 6 Jan 2014Published in the Gazette 7 Jan 2014In force from 17 Feb 2014No.L-1/132/2013/CERC dated 6th January, 2014

Replaced by Deviation Settlement Mechanism and Related Matters Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Deviation Settlement Mechanism and related matters Regulations, 2014.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is the CERC's principal Deviation Settlement Mechanism regulation for inter-State open-access transactions, notified in the Gazette of India (Extraordinary) dated 7 January 2014 and issued by the Commission on 6 January 2014 (p1, p13). It replaces the earlier unscheduled-interchange regime and comes into force on 17.2.2014 (p13).

The notification begins on p13 under Section 178 of the Electricity Act 2003. Regulations 1–4 give short title, commencement, definitions and the objective and scope: grid discipline and grid security through commercial settlement of deviations, applicable to sellers and buyers in short-term, medium-term and long-term open access in inter-State transmission (p13–14).

Regulation 5 is the core pricing regulation. It makes charges for deviation payable for over-drawal/under-injection and receivable for under-drawal/over-injection, worked out from average time-block frequency via a published rate table, with methodology for deriving the price vector from energy charges, caps for coal/lignite/APM-gas stations, treatment of infirm power, and inter-regional exchange settlement (p14–17). Regulation 6 incorporates the Grid Code and Open Access Regulations for declaration, scheduling and gaming, and gives the Commission power to inquire into and disallow gaming gains (p17). Regulation 7 sets volume limits on deviations, frequency-linked prohibitions, additional graded charges for crossing limits, a repeated-sign-change obligation, and reporting of deviation accounts (p17–20). Regulation 8 requires strict compliance with RLDC instructions (p20). Regulations 9–11 establish the Regional Deviation Pool Account Fund, weekly accounting, payment priority and timelines, interest and letter-of-credit requirements, and transfer of surplus to the Power Systems Development Fund (p20–21). Regulations 12–14 provide power to relax, power to issue directions, and repeal/savings for the 2009 UI Regulations, including continued operation of UI pool accounts until prior-period settlement (p21–22).

Annexure I and II prescribe formula and slab methodologies for additional charges for over-drawal/under-injection and under-drawal/over-injection respectively (p22–23).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Grid operation and grid code, Open access

Read with this

Other copies of these documents (5)

Earlier drafts

2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document