Skip to content

CERC · Central Electricity Regulatory Commission

Deviation Settlement Mechanism and Related Matters (Third Amendment) Regulations, 2015 — Explanatory Memorandum — Draft

Explanatory Memorandum Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) (Third Amendment) Regulations, 2015

Explanatory memorandum to a draftReleased with the notice dated 23 Oct 2015

Explanatory memorandum to the Deviation Settlement Mechanism and Related Matters, Third Amendment Regulations, 2015 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's explanatory memorandum to the proposed Third Amendment to the Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2014. It is not the amendment text; it sets out why the Commission is proposing revised State DSM limits and what States must do to manage load-generation balance (p1, p12).

Pages 1–2 introduce the DSM Regulations 2014, the first and second amendments, and the grid-discipline objective. They report frequency improvement and note that some States still deviate heavily, despite the existing volume limits, and that States have blamed renewable integration for the financial burden. Pages 2–3 reproduce Regulation 7's volume-limit and additional-deviation-charge framework and the relaxation given by CERC's order of 20.1.2015 in Petition No. 6/RP/2015 for utilities with schedule of 400 MW or below.

Pages 3–7 record State concerns: Madhya Pradesh, Gujarat and Maharashtra seek higher or RE-adjusted deviation limits, compensation for RE-rich States, exclusion of infirm wind generation, and a graded limit scheme. The Commission's analysis rejects the larger proposals as unsafe for grid operation; explains that the 15% RE forecasting tolerance is not a licence to pass deviations to the State boundary; and points to load forecasting, RE forecasting, spinning reserves and ancillary services as the required response. It cites the Ancillary Services Operations Regulations of August 2015 and the suo-motu reserves order of 13.10.2015, and summarises the roadmap for reserves, AGC and a market-based ancillary services framework (pp5–7).

Pages 8–12 set out the proposed way forward. The medium-to-long-term roadmap covers load forecasting; intra-state deviation settlement, metering, accounting and software; RE forecasting and scheduling; State spinning reserves and ancillary services; faster intra-day trading; and cooperation with neighbouring States, with a 3–6 month implementation estimate (pp8–9). The transitional arrangement proposes State-wise DSM limits based on FY 2014-15 peak demand, following an L10-like model with higher percentage allowances for smaller States and caps for larger ones, valid from notification until 31.03.2017 and to be tightened after April 2017 (pp9–12). It clarifies that generating stations remain under the existing seller limits, and that a State selling as a regional entity is treated as a seller under Annexure III (p12).

Annexure I presents deviation trends for selected States (pp13–18). Annexure II, based on POSOCO's 2013-14 SCADA analysis, reports that State-boundary deviations correlate much more with demand and conventional generation changes than with wind variability (pp19–21). Annexure III explains NERC's CPS1, CPS2 and DCS balancing metrics and aligns the Indian volume-limit and zero-crossing concepts with them (p22).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Ancillary services and reserves, Scheduling and despatch

Read with this

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document