Skip to content

CERC · Central Electricity Regulatory Commission

Deviation Settlement Mechanism and related matters, 2014 — Fifth Amendment Regulations, 2019 — Draft

Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) (Fifth Amendment) Regulations, 2019

Draft amendmentDated 18 Apr 2019No. L-1/132/2013-CERC dated 18th April, 2019

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's draft Fifth Amendment to the CERC (Deviation Settlement Mechanism and related matters) Regulations, 2014 — a public-comment draft dated 18 April 2019 that would take effect only from the date of gazette notification (p1). It is aimed at regional entities, generating stations and entities transacting across regions or across the border, and it reworks how deviation is defined, priced and penalised.

Clauses 2 and 3 (pp1–2) add two definitions that separate daily and time-block deviation charges from the extra charges under Regulation 7, and lay down computation rules for inter-regional and cross-border deviation (on the unconstrained Day Ahead Market clearing price) and for an entity spread over several bid areas (on the daily average ACP of its largest-demand bid area). Clause 3 also replaces the former energy-charge-linked ceiling with a single pan-fuel cap rate for all generating stations, whether or not their tariff is regulated, at 303.04 Paise/kWh (p2). Clause 4.1 deletes the proposed daily volume-limit proviso (3%/1% with a 20% additional charge) and Clause 4.2 substitutes the same fixed cap rate wherever the energy-charge formulation appeared in Regulation 7.

Most of the draft concerns Regulation 7. Clause 4 replaces the additional-charge trigger for over-injection/under-drawal at frequencies of 50.10 Hz and above (p3), and rewrites the sustained-deviation regime: a 12-time-block correction requirement up to 31.03.2020 and a 6-time-block requirement from 01.04.2020, each with sign-change or +/-10 MW correction, a graded additional-charge table for repeat violations in a day, and a list of exemptions (renewable regional entities, run-of-river without pondage, pre-CoD testing injection, start-up drawal, inter-regional deviations and forced outage in collective transactions) (pp3–6). An Explanation defines sustained deviation and two worked illustrations show how violations are counted (pp5–6). Clause 4 also preserves Section 142 action for contravention and deletes Regulation 7(11)(a) (p6). Clause 5 makes the conforming change to Annexure-I's methodology note (p6).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM)

Read with this

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document