CERC · Central Electricity Regulatory Commission

Corrigendum to the Deviation Charges Notification, 6 January 2014

Corrigendum

CorrigendumDated 17 Feb 2014No. L-1/132/2013-CERC-Pt dated 17th February, 2014

Replaced by Deviation Settlement Mechanism and Related Matters Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Corrects the Deviation Settlement Mechanism and related matters Regulations, 2014 or one of its amendments.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page corrigendum, signed by CERC's Chief (Engineering), fixing errors in CERC notification No. L-1/132/2013-CERC dated 6 January 2014 (Gazetted 7 January 2014) — the notification that lays down deviation charges and grid-frequency-linked rates. It replaces a word at page 16 of that notification and renumbers Tables A/B as Table I/II, adding "(A)" markers, on pages 17–18 (p1–2). Two provisos are inserted: pre-COD start-up drawal by a generating station is exempt from additional deviation charges, and where a schedule is below 150 MW deviation charges are worked out as a percentage of deviation against a 150 MW reference (p1–2). It also deletes lines at page 19, changes a year figure from 2013 to 2014 at page 22, and substitutes the clause governing frequency below 49.7 Hz with fixed charge rates for Dtb (p2).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM)

Read with this

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document