Deviation Settlement Mechanism and related matters (Second Amendment) Regulations, 2015

Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) (Second Amendment) Regulations, 2015

Amendment · Gazette copyDated 7 Aug 2015In force from 1 Nov 2015No. 1/14/2015-Reg. Aff. (FSDS) (ii)CERC.— dated 7th August, 2015

Replaced by Deviation Settlement Mechanism and Related Matters Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Deviation Settlement Mechanism and related matters (Second Amendment) Regulations, 2015.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

An amendment to the CERC's Deviation Settlement Mechanism (DSM) framework that carves wind and solar generators which are *regional entities* out of the general frequency-linked deviation regime and gives them a separate settlement arrangement. Notified on 7 August 2015 (p3), it comes into force on 1 November 2015 (p4) and amends the CERC (Deviation Settlement Mechanism and related matters) Regulations, 2014 (p3).

Clause 2 adds two definitions to Regulation 2 of the principal regulations: 'Absolute Error' — the error between actual and scheduled generation of a wind or solar regional entity, expressed as a percentage of Available Capacity for each 15-minute block — and 'Available Capacity (AvC)' — the cumulative capacity rating of the wind turbines or solar inverters capable of generating in that block (p4).

Clauses 3 to 6 rework Regulation 5. The general over-injection provision is amended so that its zero-charge threshold for over-injection beyond a set share of schedule or a MW cap no longer applies to wind and solar regional entities (p4). New sub-clauses (v) to (vii) then set out how these generators are settled: they are paid as per schedule, with under-injection and over-injection deviation charges payable to or from the Regional DSM Pool according to Absolute Error slabs given in Table I and Table II (p4–5). The rate applied is the Fixed Rate — the PPA rate determined under section 62 or adopted under section 63, weighted-averaged where there are multiple PPAs and supported by an affidavit filed with the RPC; for open access participants selling power not counted toward the buyer's RPO, and for captive wind/solar plants, it is the national Average Power Purchase Cost determined by the Commission through a separate order (p5). Sub-clause (vii) requires deviations to be netted monthly across the pool, with residual shortfall met by NLDC purchasing solar and non-solar RECs from Pool Account funds, and positive balances carried forward as notional RECs (p5). Regulation 5(2) and the volume limits and consequences under Regulation 7 are declared inapplicable to these generators (p5–6). A closing Note records the publication history of the principal regulations, their corrigendum and the first amendment (p6).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC)

Read with this

Other copies of these documents (5)

Earlier drafts

2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document