Skip to content

CERC · Central Electricity Regulatory Commission

Explanatory Memorandum — Draft DSM (Fifth Amendment) Regulations, 2019

Explanatory Memorandum

Explanatory memorandum to a draftReleased with the notice dated 18 Apr 2019

Explanatory memorandum to the Deviation Settlement Mechanism and related matters, 2014 — Fifth Amendment Regulations, 2019 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's explanatory memorandum for the draft DSM (Fifth Amendment) Regulations, 2019 (p1). It explains why the Commission proposes to change the principal deviation settlement framework; it is not the text of the amendments themselves. The introduction records the Fourth Amendment notified on 20 November 2018 and brought into force on 1 January 2019, petitions by MSEDCL, CESC, MPPMCL and WBSEDCL before the Delhi High Court, and the High Court's order dated 27.03.2019 directing the Commission to consider representations on Regulation 7(10) and related clauses (p1–2). It also lists representations from regional power committees, central and state utilities, and other stakeholders (p2–3).

Issue 1 deals with sign-change norms and the additional surcharge for sustained deviation (p3–9). Stakeholders object to the surcharge because settlement is based on SEM meter data rather than SCADA data, and ask for relief for nuclear portfolios, distribution licensees, RE generation, hydro resources and heat-recovery stations (p3–5). The Commission proposes a tolerance band around schedule, a longer sign-change window until 31 March 2020 and a stricter regime from 1 April 2020, with graded additional charges (p7–8). It also proposes exemptions for RE generation, inter-regional deviations, forced outages in collective transactions, startup drawal and pre-CoD infirm injection (p8). It proposes to amend Regulations 7(10) and 7(11), delete 7(11)(a) and add new definitions (p9).

Issue 2 concerns the daily deviation limit and additional charge (p9–11). Stakeholders say the limit is unworkable; the Commission says it never intended immediate implementation and proposes to delete Regulation 7(1) as of now (p10–11).

Issue 3 covers other clarifications: ACP for entities in multiple bid areas, inter-regional and cross-border deviations, cap rate for hydro and gas stations, and over-injection at high frequency (p11–12). The Commission proposes amendments to clauses 5(3), 7(3), 7(4), 7(6), Table II of Regulation 7(3), Annexure-I Illustration B, and new clauses 5(2)(e) and 5(2)(f) (p12).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM), Communication and SCADA

Read with this

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document