Deviation Settlement Mechanism and Related Matters (First Amendment) Regulations, 2014 — Draft

Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) (First Amendment) Regulations, 2014

Draft amendmentDated 24 Jun 2014L-1/132/2013-CERC dated 24th June, 2014

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's draft First Amendment to its Deviation Settlement Mechanism Regulations, 2014, issued in draft with an attached Explanatory Memorandum.

The draft notification (p1) makes four changes. It replaces a fixed calendar date in Regulation 5(1)(ii) — the date from which no cap rate applies to deviations by CERC-regulated stations using APM gas — with the date on which the Government of India revises the APM gas price. It changes the corresponding infirm-power injection provision in Regulation 5(5) so the existing rate holds until that same revision date, after which the Commission will notify a rate separately. It deletes the provisos to Regulation 7(1) and proviso (i) to Regulation 7(2), which imposed volume limits on buyer overdrawal/underdrawal and seller under-injection/over-injection, and barred such deviations at low frequency. Finally it corrects the illustration notation in para C of Annexure-II, substituting 'D 12/150' with 'Dtb'. Commencement is from publication in the Official Gazette.

The Explanatory Memorandum (pp2–3) gives the reasoning: the APM gas price was not revised with effect from 1.4.2014 as assumed, so an event-triggered formulation is needed; and the volume limits are unnecessary because additional deviation charges under Regulations 7(4) and 7(6) already penalise over-injection/under-drawal at high frequency and over-drawal/under-injection at low frequency. It recites the existing Regulation 7 text and the additional-charge methodology, including the cap rate applying to coal, lignite and APM-gas stations.

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM)

Read with this

Other copies of these documents (6)

Earlier drafts

2 more documents belong here and are not on Voltaic: 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document