Tamil Nadu Electricity Distribution Code 2006 — Amendment — point of supply beyond 30 m

Tamil Nadu Electricity Distribution (Amending) Code 2006

AmendmentDated 14 Jun 2006Published in the Gazette 16 Aug 2006In force from 23 Feb 2006TNERC/DC/8-2 (1) dated 14.06.2006

Amends the Tamil Nadu Electricity Distribution Code.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This two-page gazette extract contains an amendment to the Tamil Nadu Electricity Distribution Code. The Commission records (p2) that it had already amended the Code by Notification No. TNERC/DC/8-2 dated 23.02.2006, gazetted on 15.03.2006, and that the Tamil Nadu Electricity Board, as distribution licensee, reported difficulties in implementing that amendment. This further amendment is issued to remove those difficulties, after previous publication.

The operative change is in Regulation 2 (pp2–3), which substitutes the proviso to clause (b) of Regulation 29(14) of the Distribution Code. The new proviso lets the Chief Executive Officer, or any officer not below the rank of Chief Engineer authorised by him, approve a point of supply located more than 30 metres from the main gate. The officer must be satisfied that the place is easily accessible and visible to licensee officials, is safe and secure, and is not susceptible to malpractice, and no technical ground may be compromised while the distance criterion is relaxed.

Regulation 1 (p2) names the instrument and deems it to come into force from 23.02.2006, the same date as the earlier amendment it follows, so the relaxation applies retrospectively to that date.

Standard name
Distribution Code
Primary topics
Distribution system planning and operation, New connections and load changes

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Proposed changes (drafts with no final yet)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document