Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Distribution Code — Amendment, 2019

Amendments To The Tamil Nadu Electricity Distribution Code

AmendmentDated 18 Dec 2019Published in the Gazette 29 Jan 2020TNERC/DC/8-25 dated 18-12-2019

Amends the Tamil Nadu Electricity Distribution Code.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

What this is. The Tamil Nadu Electricity Regulatory Commission's amendment to the Tamil Nadu Electricity Distribution Code, notified as Notification No. TNERC/DC/8-25 dated 18-12-2019 and carried in the Tamil Nadu Government Gazette of 29 January 2020 (p1–2). It is made under section 181 read with section 46 of the Electricity Act 2003, the draft having been published first under section 181(3) (p2).

Service connection applications (p2). The Note to Regulation 27(3) is replaced by an Explanation that rewrites how requisitions for HT and LT supply must be handled. It covers applications handed over in person, sent by post and filed online through the licensee's portal, and specifies acknowledgement (writing, email, portal self-generation, optional SMS), what counts as registration, and the consequences of an incomplete application — which differ between HT and LT, with a cure period and exposure to cancellation on the LT side.

Sub-station land (p2–3). Regulation 29(12)(ii) is substituted to widen the class of premises that must earmark land for a sub-station or switching station, keyed to demand and built-up-area thresholds and expressly excluding industrial service connections. It caps land by sub-station voltage level, distinguishing normal from compact sub-stations, requires the earmarked area to be shown in the plan filed when applying for a temporary service connection for construction, and puts the cost difference between conventional and compact sub-stations on the developer/applicant.

Forms (p3, p5–6). Annexure III is amended to add a field on pending dues to the premises in Forms 1, 3 and 4, and Form 4's title is re-framed from a maximum demand "exceeding 63 KVA" to "of 63 KVA and above".

Supporting material (p3–6). An Explanatory Statement gives the two reasons — easing online application handling and helping the licensee obtain sub-station land — and attributes the change to a proposal from the Code Review Panel. A comparative statement then sets out the old and new text side by side.

What is not here. The gazette contents page (p1) also advertises amendments to the Tamil Nadu Electricity Supply Code.

Standard name
Distribution Code
Primary topics
New connections and load changes, Distribution system planning and operation

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Proposed changes (drafts with no final yet)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document