Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Distribution Code, 2004 — Amendments, 2023

Amendments to the Tamil Nadu Electricity Distribution Code

AmendmentDated 2 Sep 2023Notification No. TNERC/DC/ 8-29 dated 02.09.2023

Amends the Tamil Nadu Electricity Distribution Code.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software, from pages 1 to 20 of 22. Check the regulator's original before you rely on it.

This is a TNERC notification amending the Tamil Nadu Electricity Distribution Code, 2004, issued on 2 September 2023 under section 181 read with sections 46 and 86 of the Electricity Act, 2003, after previous publication (p1). It carries 42 numbered amendments (pp1–7) followed by an explanatory statement (p7) and a comparative Annexure that prints the old and new text side by side (pp8–20). The explanatory statement ties the changes to the Electricity (Rights of Consumers) Rules, 2020 and to the recommendations of the Code Review Panel constituted under Regulation 51 (p7).

The consumer-facing core is Regulation 27 (requisitions for supply). The licence duty is recast to give supply within one week where no mains extension or new substation is needed, with the period falling back on the Distribution Standards of Performance Regulations, 2004 where augmentation is required (p1). For agriculture, digging of a well or bore well is no longer insisted on at registration, and a 90-day notice, a readiness register and field inspection within three days are specified for turn-based release (p2). Application handling is proceduralised in detail: online, mobile-app and in-person filing, registration and defect handling within fixed days, acknowledgement within twenty-four hours, and application tracking (pp2–3). Building-height clearance requirements are clarified against statutory building rules, and multiple tariff I-D connections for common facilities in multi-tenement residences are exempted from the normal conditions (p3).

Regulation 29 is rewritten on space for substations: what applicants in group housing, commercial complexes, industrial estates and SEZs must allot at or above stated demand and floor-area thresholds, the option of land outside the premises, and the deed forms for handing land over (pp3–4). Regulation 31 covers retention of test reports and minimum charges during the notice period (p5); Regulation 33 covers final billing, adjustment of dues against security deposit and refund timelines on permanent disconnection (p5); Regulation 39 covers pre-payment meters for temporary supply and the security-deposit formula where only conventional meters are available (pp5–6); Regulation 45 restates who bears service-connection and development charges (p6). The remaining clauses rename Annexures I–III as Appendices and add identity-proof enclosures to Forms 1–4 (pp6–7).

Standard name
Distribution Code
Primary topics
Conditions of supply, New connections and load changes, Agricultural supply

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Proposed changes (drafts with no final yet)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document