Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Distribution Code, as amended up to 31.12.2009 — Consolidated

Tamil Nadu Electricity Distribution Code

Consolidated copyDated 31 Dec 2009Published in the Gazette 13 Apr 2011TNERC/DC/8-13 dated 07.01.2010

A consolidated copy of the Tamil Nadu Electricity Distribution Code, published by TNERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software, from pages 1 to 21 of 66. Check the regulator's original before you rely on it.

This is a consolidated re-publication of the Tamil Nadu Electricity Distribution Code, issued by the Tamil Nadu Electricity Regulatory Commission "as amended up to 31.12.2009". Pages 1–2 carry the republishing notification TNERC/DC/8-13 dated 07.01.2010: it lists the 14 original and amending notifications from 21.07.2004 to 24.08.2009 whose contents are incorporated, states that the Commission is re-publishing them so the public has an up-to-date text, and places the consolidated Code in Part VI, Section 2 of the Tamil Nadu Government Gazette — the copy printed here being the Gazette of Wednesday 13 April 2011 (p1–2).

Pages 3–5 are the Code's Chapter 1: clause 1 on short title and commencement, and clause 2, a long definitions clause covering load, demand, voltage classes, the billing month and the year, and the Engineer's role (p3–5). Pages 5–6 are Chapter 2, clause 3, which assigns roles to the entities in distribution — the State Load Dispatch Centre, the State Sub Load Dispatch Centre, the State Transmission Utility, the distribution licensee and the Commission itself (p5–6).

Sections 18–23 deal with accident reporting and major incident reporting, with a table of reporting time frames for licensees, and with condition-based monitoring and preventive maintenance, tools/plants/spares, training, and research and development (p18–20). Chapter 6 begins at page 20: clauses 24–27 set the terms and conditions of supply — the system of supply and declared voltages, categories of supply keyed to connected load and demand thresholds, and requisitions for supply including agricultural applications, HT and LT application forms, and the consent-letter/indemnity route for applicants who are not owners (p20–21).

Standard name
Distribution Code
Primary topics
Conditions of supply, Distribution system planning and operation, New connections and load changes

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (3)

Proposed changes (drafts with no final yet)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document