Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Distribution Code, Regulation 39 (Temporary Supply) — Amendment, 2013

Amendment to regulation 39-temporary Supply

AmendmentDated 6 Sep 2013Published in the Gazette 19 Sep 2013TNERC/DC/8 – 17 dated 06-09-2013

Amends the Tamil Nadu Electricity Distribution Code.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a TNERC amendment substituting regulation 39 of the Tamil Nadu Electricity Distribution Code, which governs temporary supply of electricity. It was made under section 181 read with section 46 of the Electricity Act, 2003, issued on 06-09-2013 and gazetted on 19-09-2013 (p1).

The core change splits temporary supply into two distinct tracks. The first is temporary supply that is expected to convert into permanent supply, as in building construction: the ordinary permanent-supply procedure is to be followed while billing at the temporary-supply tariff, with a written undertaking from the consumer to convert to the appropriate permanent category and to pay any resulting charges (p2). Where conversion crosses voltage levels, the lower-voltage connection is closed and a new higher-voltage connection given, with a credit/debit settlement for dismantled, reused, scrapped and newly erected service-line material and for dismantling, transport and erection charges borne by the consumer (p2).

The second track covers supply purely for temporary purposes (p2–3): line extension and improvement costs are charged to the consumer, and a security deposit is collected and maintained throughout the temporary period, computed by a stated formula built on connected load, a load factor, hours per day, billing-cycle days and the temporary-supply tariff (p3). The deposit is reviewed each billing cycle and topped up with current consumption charges if it falls below the required level, and the account is closed at the end of the period with refund of the balance within a period the Commission specifies (p3).

The Explanatory Statement (p4) records the rationale: a separate temporary-supply tariff already exists in the Retail Tariff Order dated 20-06-2013, and applicants — especially domestic or residential construction — struggle with the special terms and conditions of the old regulation 39, so it is being segregated into the two categories. The closing pages (pp5–7) set out the old and substituted text side by side.

Standard name
Distribution Code
Primary topics
Conditions of supply, New connections and load changes, Security deposit

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Proposed changes (drafts with no final yet)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document