Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Distribution Code — Regulation 39 Temporary Supply Amendment, 2013 — Draft

Draft Notification No. TNERC/DC/8 – . dated -2013.

Draft amendmentDated 17 Jul 2013TNERC/DC/8

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Tamil Nadu Electricity Regulatory Commission draft notification (TNERC/DC/8) proposing to replace Regulation 39 of the Tamil Nadu Electricity Distribution Code on temporary supply, made under section 181 read with section 46 of the Electricity Act 2003 (p1). The accompanying notice states that the amendment will be published in the Tamil Nadu Government Gazette fifteen days after being hosted on the Commission's website, and invites suggestions or objections to the Secretary in the meantime (p1).

The substituted Regulation 39 splits temporary supply into two situations (pp1–2). Where the supply is expected to be converted into permanent supply — building construction being the example — the normal procedure for regular categories applies, the consumer pays temporary supply tariff, gives an undertaking to convert after the work is done, and bears additional service line cost and statutory charges at conversion. Where supply is purely temporary, the normal procedure is again followed but service line charges include extension and improvement charges, and a security deposit tied to current consumption charges is held across the supply period, reviewed every billing cycle and topped up when short. On closure, the account is credited with book/written-down value of retrievable and reusable material and scrap value of retrievable but non-reusable material, and debited with dismantling, transport and overhead charges capped at the original network cost; the balance deposit is refunded within a period the Commission is to specify.

The Explanatory Statement (p3) explains the trigger: the Retail Tariff Order of 20 June 2013 already carries a separate temporary supply tariff, but applicants — particularly domestic/residential builders — find Regulation 39's special conditions hard to follow, so the two-category split is proposed. Pages 4–5 add a comparative statement setting the existing text against the proposed text.

Standard name
Distribution Code
Primary topics
Conditions of supply, New connections and load changes, Connection and miscellaneous charges

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Proposed changes (drafts with no final yet)

25 more documents belong here and are not on Voltaic: 25 copies in another language.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document